How to read this
FABER CA23109 Stakeholder Analysis & Engagement Plan
Fatigue Benchmark Repository · COST Action CA23109. Prepared for the Core Group and the Stakeholders Task Force as a basis to refine.
What this file contains One consolidated workbook: the explanatory notes, the three operational tabs (Groups Analysis, D-Critical, Round Robin), and the analytical instruments (Register, Salience, Power-Interest, Engagement, Comms Plan, Risk Linkage, PASP Map, Dashboard). It applies the framework 'From Mapping to Impact: Research, Policy & Knowledge Translation', a strategic stakeholder framework, to FABER. — Click on image to access the Framework
Tab: Stakeholder Groups Analysis The full register in Quadruple-Helix groups (academia, industry, government/policy, civil society). Each row is one named entity, scored and tagged. WHO matters and HOW MUCH.
Tab: D-Critical Stakeholders The entities critical to specific FABER deliverables, with a recommended first action and timeline. WHERE TO START.
Tab: FABER Round Robin Sequenced engagement rounds tied to the milestone timeline, from scoping in Year 1 to uptake and sustainability planning in Year 4. IN WHAT ORDER.
Tab: Register Master inventory: each external stakeholder, its interest in FABER, what FABER needs from it, geography, linked WGs and owner.
Tab: Salience (Mitchell, Agle & Wood 1997) Power · Legitimacy · Urgency, each 1-5 (present at >=3). Yields a salience class from Definitive (all three) to Latent (none). The CLASS, not the sum, drives strategy.
Tab: Power-Interest Classic 2x2: Manage Closely / Keep Satisfied / Keep Informed / Monitor, with a recommended strategy per quadrant.
Tab: Engagement (IAP2) Current vs target engagement level (Inform → Consult → Involve → Collaborate → Empower) and the action to close the gap.
Tab: Comms Plan Per-stakeholder key message, channel, frequency, owner, KPI and linked deliverable.
Tab: Risk Linkage MoU §4.1.3 risks mapped to the stakeholders they affect, with likelihood x impact and a mitigation owner.
Tab: PASP Map Post-Action sustainability pillars and their anchor stakeholders, converging on the European Fatigue Observatory & Innovation Centre.
Tab: Dashboard Live counts by salience class, Power-Interest quadrant and category. Editing any score updates the Dashboard automatically.
Emphasis on policymakers Policymakers are treated as a first-class group: Commission DGs (GROW, RTD, CNECT), the European Parliament committees, national ministries, and sectoral regulators (EASA, ERA, EMSA). Without them, FABER's outputs do not become normative or sustained, and the PASP has no public anchor.
The three MoU communities FABER's deadlock can only be broken by ACADEMIA (holds and validates data), INDUSTRY end users (generate problems, bear failures), and FATIGUE SOLVER DEVELOPERS (control tools, deny warranty). Solver developers are the hardest and highest-priority community to convert.
Scoring note Scores (1-5; influence 0-100) are analytical starting estimates from the MoU and the live roster, for calibration with the Core Group, not measured data. Summary figures on the Dashboard are live formulas.
Scope Internal COST governance bodies and the Action's own members are deliberately excluded, to concentrate on external stakeholders whose adoption turns FABER outputs into impact.
Register
| REGISTER · Master inventory of FABER external stakeholders | |||||||
| Each external stakeholder: interest in FABER, what FABER needs, geography, linked WGs. | |||||||
| ID | Stakeholder / Group | Category | Example entities / members | Primary interest in FABER | What FABER needs from them | Geography | Linked WG(s) |
| 1 | European Commission — DG GROW (industrial competitiveness) | Policy & regulatory | DG Internal Market, Industry | Industrial competitiveness; advanced manufacturing | Policy uptake; competitiveness evidence; PASP & funding alignment | EU | WG4·WG5 |
| 2 | European Commission — DG RTD (research & innovation) | Policy & regulatory | Horizon Europe; research infrastructures | Follow-on funding; research-infrastructure alignment | Sustainability funding; Horizon alignment for PASP | EU | All |
| 3 | European Commission — DG CNECT (digital/data spaces) | Policy & regulatory | Common European Data Space for Manufacturing | FAIR, sovereign, federated data spaces | Position FABER as the fatigue-data node in the Manufacturing Data Space | EU | WG1·WG6 |
| 4 | European Parliament committees (ITRE; ENVI; IMCO) | Policy & regulatory | MEPs; committee secretariats | Safety, competitiveness, sustainable industry | Political visibility; legitimacy for benchmarking | EU | WG4·WG5 |
| 5 | National ministries (industry, research, transport) | Policy & regulatory | Member-State ministries | National co-funding; uptake; implementation | National backing; co-funding for interface/tool work | Per country | WG1·WG4 |
| 6 | EASA (aviation safety) | Policy & regulatory | EU aviation regulator | Downstream beneficiary; safety assurance | Regulatory relevance; validation evidence in aviation | EU | WG4·WG5 |
| 7 | EU Agency for Railways (ERA) | Policy & regulatory | EU rail regulator | Downstream beneficiary; interoperability & safety | Regulatory relevance in rail | EU | WG4·WG5 |
| 8 | EMSA (maritime safety) | Policy & regulatory | EU maritime regulator | Downstream beneficiary; structural integrity | Regulatory relevance in maritime/offshore | EU | WG4·WG5 |
| 9 | Joint Research Centre (JRC) | Policy & regulatory | EC in-house science; SSbD; ODIN/MatDB | Policy-relevant data infrastructure | Hosting/credibility option; data-aggregation reuse | EU | WG1 |
| 55 | National safety & infrastructure regulators | Policy & regulatory | National aviation, rail, infrastructure authorities | Implementation-level safety assurance | Implementation realism; national legitimacy | Per country | WG4·WG5 |
| 56 | Defence & dual-use procurement agencies | Policy & regulatory | National & EU defence procurement (EDA) | Structural integrity of defence assets | Dual-use validation; procurement legitimacy | EU | WG4·WG5 |
| 10 | European fatigue research groups (Fraunhofer LBF/IWM, PoliMi, TU Delft, NTUA) | Academia | University & institute fatigue/fracture labs | Free access to curated data sets | Data contribution; benchmark validation; method expertise | EU+NNC | WG2·WG4·WG5 |
| 11 | Experimental fatigue laboratories | Academia | Test houses able to run campaigns | Recognition; shared workload | Run competition experiments; raw data; specimens | EU+global | WG3·WG4 |
| 12 | Materials-modelling & ML researchers | Academia | Multiscale / ML modellers (WG2.3) | ML on large fatigue data sets | Validate AI/ML enhancement of data sets | EU | WG2.3 |
| 13 | Czech Academy of Sciences & national laboratories | Academia | National research institutes | Historical data; curation capacity | Historical data; curation; record-format consensus | EU | WG1·WG2 |
| 14 | Aerospace OEMs & engine makers (Airbus, Rolls-Royce, Safran) | Industry — end user | Aero structures; discs; riveted joints | Safety-critical fatigue confidence | Domain problems; validation cases; early adoption | EU+global | WG4·WG5 |
| 15 | Energy & offshore operators (Siemens Energy, wind/offshore) | Industry — end user | Rotors, towers, jackets, floating structures | Reliable long-life fatigue assessment | Sector use cases; sustainability backing | EU+global | WG4·WG5 |
| 16 | Automotive & rail OEMs (Volvo, Stellantis, Alstom) | Industry — end user | Vehicle, powertrain & rolling-stock makers | Reliable, lower-cost fatigue assessment | Use cases; sustainability backing; adoption | EU+global | WG4·WG5 |
| 17 | Additive manufacturing firms | Industry — end user | AM part producers | Fatigue of AM/porous structures | Emerging-defect use cases (WG5.1) | EU | WG5.1 |
| 18 | Steel / welded-structure fabricators | Industry — end user | Bridges, towers, offshore | Welded-joint fatigue (HAZ) | Welded-joint use cases & data (WG5.3) | EU | WG5.3 |
| 19 | SMEs performing fatigue analysis | Industry — end user | Medium/small engineering firms | Affordable, trustworthy validation | Demand signal; adoption | EU | WG3·WG4 |
| 20 | Large in-house fatigue groups | Industry — end user | Corporates with private benchmarks | Cross-validation; talent pipeline | Tacit endorsement; YRI hiring | EU+global | WG2·WG4 |
| 21 | Safety-critical infrastructure operators | Industry — end user | Rail, energy, offshore, bridges | Asset integrity & life extension | Real-world problem definitions | EU | WG5 |
| 51 | Shipbuilding & marine structures | Industry — end user | Shipyards; marine structure fabricators | Hull & welded-joint fatigue over long service lives | Marine welded-joint use cases & data | EU+global | WG5 |
| 52 | Heavy machinery & off-highway | Industry — end user | Construction, mining, agricultural machinery | Durability under variable-amplitude duty cycles | Variable-amplitude & multiaxial use cases | EU+global | WG4·WG5 |
| 53 | Civil infrastructure owners & engineers | Industry — end user | Bridges, towers, stadia; consulting engineers | Eurocode-anchored fatigue assessment | Civil use cases tied to EN 1993-1-9 | EU | WG4·WG5 |
| 22 | Dassault Systèmes (SIMULIA / fe-safe) | Solver developer | fe-safe | Customer assurance; reputation | Engagement; benchmark participation | FR/global | WG3·WG4·WG6 |
| 23 | Ansys (nCode DesignLife) | Solver developer | nCode DesignLife | Customer assurance; reputation | Engagement; participation | US/global | WG3·WG4·WG6 |
| 24 | Siemens / Hexagon / MSC | Solver developer | Simcenter; MSC Fatigue | Customer assurance; reputation | Engagement; participation | DE/US | WG3·WG4·WG6 |
| 25 | Open-source fatigue tool community (FatPy) | Solver developer | Python fatigue libraries; FABER tool | Shared, maintained code base | Co-develop the open-source library (WG6) | Global | WG6 |
| 26 | ISO fatigue technical committees | Standards & certification | ISO TCs (12107, 12108) | Normative uptake | Pre-normative input; record-format & methods | Global | WG1·WG2·WG4 |
| 27 | CEN / Eurocode committees (EN 1993-1-9) | Standards & certification | CEN TCs | Code calibration evidence | Long-term standardisation pathway | EU | WG2·WG3·WG4 |
| 28 | ASTM International (fatigue committees) | Standards & certification | ASTM E739, E466, E606 | Reporting & method alignment | Reporting-convention alignment | Global | WG2·WG4 |
| 29 | NAFEMS | Standards & certification | FE methods & standards body | V&V standards | Joint workshop; credibility | UK/global | WG1·WG4 |
| 30 | FKM (FKM Guideline) | Standards & certification | German assessment guideline | Guideline calibration | Acceptance-criteria alignment | DE/EU | WG2·WG4 |
| 31 | Certification bodies (DNV, Lloyd's Register, Bureau Veritas, TÜV) | Standards & certification | Notified bodies; class societies | Liability & risk reduction | Endorse benchmarking as due diligence | EU/global | WG3·WG4·WG5 |
| 32 | EOSC / FAIR data infrastructure | Data & open science | European Open Science Cloud | Open, findable research data | FAIR-compliant hosting; DOIs/PIDs | EU | WG1·WG6 |
| 33 | OpenAIRE | Data & open science | OA aggregation & PID services | Open-access aggregation | Citable releases; metadata harvesting | EU | WG1·WG6 |
| 34 | Common European Data Space for Manufacturing (Catena-X, Factory-X, Aerospace-X) | Data & open science | Sectoral data spaces under Gaia-X | FAIR sovereign federated data | FABER as the fatigue-data node | EU | WG1·WG6 |
| 35 | FAIR-data experts & research software engineering communities | Data & open science | RSE & RDM practitioners | Operationalise FAIR & OSS governance | FAIRification; FatPy governance | EU | WG1·WG6 |
| 36 | EMMC (Eur. Materials Modelling Council) | Data & open science | Modelling & Validation WG; Repositories WG | Complementarity; recruitment | Avoid overlap; recruit participants | EU | WG1 |
| 54 | National research data repositories | Data & open science | Member-State data repositories | Persistent national hosting & curation | Federated hosting; national data feeds | Per country | WG1·WG6 |
| 37 | ESIS (European Structural Integrity Society) | Networks & dissemination | Structural-integrity community | Dissemination; standards alignment | Audience; standardisation route | EU | WG2·WG3·WG4 |
| 38 | IIW (International Institute of Welding) | Networks & dissemination | Welding standards community | Welded-joint fatigue standards | Standards alignment (WG5.3) | Global | WG5.3 |
| 39 | European Federation of Corrosion (EFC) | Networks & dissemination | Corrosion-fatigue community | Environmental-fatigue relevance | Environmental & corrosion-fatigue input (WG5) | EU | WG5 |
| 40 | National engineering societies (DVM, SF2M, Gruppo Frattura, CSM, SPFIE) | Networks & dissemination | National societies | Member dissemination | National reach; recruitment | Per country | All |
| 41 | Fatigue conferences (ICF, Fatigue Design, ICEFA, ICMFF) | Networks & dissemination | International conferences | Visibility; recruitment | Dissemination venues; FABEST awards | Global | All |
| 42 | Leading fatigue journals (Int. J. Fatigue; FFEMS) | Networks & dissemination | High-impact journals | High-quality publications | 30+ papers; survey & result papers | Global | WG2·WG4·WG5 |
| 43 | Online research communities (ResearchGate, iMechanica, LinkedIn) | Networks & dissemination | Online platforms | Reach; informal recruitment | Amplification; community uptake | Global | All |
| 44 | GSS / Kos Science Forum platform | Networks & dissemination | Science-to-policy amplification | Cross-Action visibility | Hosting; science-to-policy amplification | EU | All |
| 45 | Related COST Actions & Horizon Europe projects | Capacity & cross-cutting | EMMC; data-space & materials projects | Cross-fertilisation; PASP partnership | Joint activities; successor consortium | EU | All |
| 46 | Early-Career Investigators (PhDs, postdocs) | Capacity & cross-cutting | Next-generation engineers | Career growth; STSMs; training | Data Officers; FatPy contributors | EU | All |
| 47 | Digital-twin / Industry 4.0 vendors | Capacity & cross-cutting | Simulation / DT platforms | Validated fatigue modules | Integration; downstream demand | EU/global | WG6 |
| 48 | Standards test-data providers (specimen manufacturers) | Capacity & cross-cutting | Specimen manufacturers | Visibility; influence on results | Specimens & testing material | EU | WG3 |
| 49 | Educators / curriculum bodies | Capacity & cross-cutting | University teaching; CPD | Teaching material; trained graduates | Pipeline of skilled analysts | EU | WG3·WG6 |
| 50 | Insurance bodies / underwriters | Capacity & cross-cutting | Insurers; risk underwriters | Liability & risk reduction | Endorse benchmarking as due diligence | EU | WG3·WG4 |
Salience
| SALIENCE — MITCHELL, AGLE & WOOD (1997) | ||||||||
| ID | Stakeholder | Category | Power | Legitimacy | Urgency | Composite (3-15) | Salience class | Rationale |
| 1 | European Commission — DG GROW (industrial competitiveness) | Policy & regulatory | 5 | 4 | 3 | 12 | Definitive | Industrial competitiveness; advanced manufacturing |
| 2 | European Commission — DG RTD (research & innovation) | Policy & regulatory | 5 | 4 | 3 | 12 | Definitive | Follow-on funding; research-infrastructure alignment |
| 3 | European Commission — DG CNECT (digital/data spaces) | Policy & regulatory | 4 | 4 | 3 | 11 | Definitive | FAIR, sovereign, federated data spaces |
| 4 | European Parliament committees (ITRE; ENVI; IMCO) | Policy & regulatory | 4 | 4 | 2 | 10 | Dominant | Safety, competitiveness, sustainable industry |
| 5 | National ministries (industry, research, transport) | Policy & regulatory | 4 | 3 | 2 | 9 | Dominant | National co-funding; uptake; implementation |
| 6 | EASA (aviation safety) | Policy & regulatory | 4 | 3 | 2 | 9 | Dominant | Downstream beneficiary; safety assurance |
| 7 | EU Agency for Railways (ERA) | Policy & regulatory | 4 | 3 | 2 | 9 | Dominant | Downstream beneficiary; interoperability & safety |
| 8 | EMSA (maritime safety) | Policy & regulatory | 3 | 3 | 2 | 8 | Dominant | Downstream beneficiary; structural integrity |
| 9 | Joint Research Centre (JRC) | Policy & regulatory | 4 | 4 | 2 | 10 | Dominant | Policy-relevant data infrastructure |
| 55 | National safety & infrastructure regulators | Policy & regulatory | 4 | 3 | 2 | 9 | Dominant | Implementation-level safety assurance |
| 56 | Defence & dual-use procurement agencies | Policy & regulatory | 4 | 3 | 2 | 9 | Dominant | Structural integrity of defence assets |
| 10 | European fatigue research groups (Fraunhofer LBF/IWM, PoliMi, TU Delft, NTUA) | Academia | 3 | 5 | 4 | 12 | Definitive | Free access to curated data sets |
| 11 | Experimental fatigue laboratories | Academia | 3 | 4 | 4 | 11 | Definitive | Recognition; shared workload |
| 12 | Materials-modelling & ML researchers | Academia | 2 | 4 | 3 | 9 | Dependent | ML on large fatigue data sets |
| 13 | Czech Academy of Sciences & national laboratories | Academia | 3 | 4 | 3 | 10 | Definitive | Historical data; curation capacity |
| 14 | Aerospace OEMs & engine makers (Airbus, Rolls-Royce, Safran) | Industry — end user | 4 | 3 | 3 | 10 | Definitive | Safety-critical fatigue confidence |
| 15 | Energy & offshore operators (Siemens Energy, wind/offshore) | Industry — end user | 4 | 3 | 3 | 10 | Definitive | Reliable long-life fatigue assessment |
| 16 | Automotive & rail OEMs (Volvo, Stellantis, Alstom) | Industry — end user | 4 | 3 | 2 | 9 | Dominant | Reliable, lower-cost fatigue assessment |
| 17 | Additive manufacturing firms | Industry — end user | 3 | 3 | 3 | 9 | Definitive | Fatigue of AM/porous structures |
| 18 | Steel / welded-structure fabricators | Industry — end user | 3 | 3 | 2 | 8 | Dominant | Welded-joint fatigue (HAZ) |
| 19 | SMEs performing fatigue analysis | Industry — end user | 2 | 3 | 3 | 8 | Dependent | Affordable, trustworthy validation |
| 20 | Large in-house fatigue groups | Industry — end user | 4 | 3 | 2 | 9 | Dominant | Cross-validation; talent pipeline |
| 21 | Safety-critical infrastructure operators | Industry — end user | 4 | 3 | 3 | 10 | Definitive | Asset integrity & life extension |
| 51 | Shipbuilding & marine structures | Industry — end user | 3 | 3 | 2 | 8 | Dominant | Hull & welded-joint fatigue over long service lives |
| 52 | Heavy machinery & off-highway | Industry — end user | 3 | 3 | 2 | 8 | Dominant | Durability under variable-amplitude duty cycles |
| 53 | Civil infrastructure owners & engineers | Industry — end user | 3 | 3 | 2 | 8 | Dominant | Eurocode-anchored fatigue assessment |
| 22 | Dassault Systèmes (SIMULIA / fe-safe) | Solver developer | 4 | 3 | 2 | 9 | Dominant | Customer assurance; reputation |
| 23 | Ansys (nCode DesignLife) | Solver developer | 4 | 3 | 2 | 9 | Dominant | Customer assurance; reputation |
| 24 | Siemens / Hexagon / MSC | Solver developer | 4 | 3 | 2 | 9 | Dominant | Customer assurance; reputation |
| 25 | Open-source fatigue tool community (FatPy) | Solver developer | 2 | 4 | 3 | 9 | Dependent | Shared, maintained code base |
| 26 | ISO fatigue technical committees | Standards & certification | 5 | 5 | 2 | 12 | Dominant | Normative uptake |
| 27 | CEN / Eurocode committees (EN 1993-1-9) | Standards & certification | 5 | 5 | 2 | 12 | Dominant | Code calibration evidence |
| 28 | ASTM International (fatigue committees) | Standards & certification | 4 | 5 | 2 | 11 | Dominant | Reporting & method alignment |
| 29 | NAFEMS | Standards & certification | 4 | 5 | 2 | 11 | Dominant | V&V standards |
| 30 | FKM (FKM Guideline) | Standards & certification | 4 | 5 | 2 | 11 | Dominant | Guideline calibration |
| 31 | Certification bodies (DNV, Lloyd's Register, Bureau Veritas, TÜV) | Standards & certification | 4 | 3 | 2 | 9 | Dominant | Liability & risk reduction |
| 32 | EOSC / FAIR data infrastructure | Data & open science | 3 | 4 | 3 | 10 | Definitive | Open, findable research data |
| 33 | OpenAIRE | Data & open science | 3 | 4 | 2 | 9 | Dominant | Open-access aggregation |
| 34 | Common European Data Space for Manufacturing (Catena-X, Factory-X, Aerospace-X) | Data & open science | 3 | 4 | 3 | 10 | Definitive | FAIR sovereign federated data |
| 35 | FAIR-data experts & research software engineering communities | Data & open science | 2 | 4 | 3 | 9 | Dependent | Operationalise FAIR & OSS governance |
| 36 | EMMC (Eur. Materials Modelling Council) | Data & open science | 3 | 4 | 2 | 9 | Dominant | Complementarity; recruitment |
| 54 | National research data repositories | Data & open science | 3 | 4 | 2 | 9 | Dominant | Persistent national hosting & curation |
| 37 | ESIS (European Structural Integrity Society) | Networks & dissemination | 4 | 5 | 2 | 11 | Dominant | Dissemination; standards alignment |
| 38 | IIW (International Institute of Welding) | Networks & dissemination | 4 | 5 | 2 | 11 | Dominant | Welded-joint fatigue standards |
| 39 | European Federation of Corrosion (EFC) | Networks & dissemination | 3 | 4 | 2 | 9 | Dominant | Environmental-fatigue relevance |
| 40 | National engineering societies (DVM, SF2M, Gruppo Frattura, CSM, SPFIE) | Networks & dissemination | 3 | 4 | 2 | 9 | Dominant | Member dissemination |
| 41 | Fatigue conferences (ICF, Fatigue Design, ICEFA, ICMFF) | Networks & dissemination | 3 | 4 | 3 | 10 | Definitive | Visibility; recruitment |
| 42 | Leading fatigue journals (Int. J. Fatigue; FFEMS) | Networks & dissemination | 3 | 4 | 3 | 10 | Definitive | High-quality publications |
| 43 | Online research communities (ResearchGate, iMechanica, LinkedIn) | Networks & dissemination | 2 | 3 | 3 | 8 | Dependent | Reach; informal recruitment |
| 44 | GSS / Kos Science Forum platform | Networks & dissemination | 3 | 4 | 3 | 10 | Definitive | Cross-Action visibility |
| 45 | Related COST Actions & Horizon Europe projects | Capacity & cross-cutting | 3 | 4 | 2 | 9 | Dominant | Cross-fertilisation; PASP partnership |
| 46 | Early-Career Investigators (PhDs, postdocs) | Capacity & cross-cutting | 2 | 4 | 3 | 9 | Dependent | Career growth; STSMs; training |
| 47 | Digital-twin / Industry 4.0 vendors | Capacity & cross-cutting | 3 | 3 | 2 | 8 | Dominant | Validated fatigue modules |
| 48 | Standards test-data providers (specimen manufacturers) | Capacity & cross-cutting | 2 | 3 | 3 | 8 | Dependent | Visibility; influence on results |
| 49 | Educators / curriculum bodies | Capacity & cross-cutting | 2 | 3 | 2 | 7 | Discretionary | Teaching material; trained graduates |
| 50 | Insurance bodies / underwriters | Capacity & cross-cutting | 3 | 3 | 2 | 8 | Dominant | Liability & risk reduction |
| SALIENCE CLASS LEGEND (Mitchell, Agle & Wood 1997) | ||||||||
| Definitive | Power+Legitimacy+Urgency — top priority; manage closely and first. | |||||||
| Dominant | Power+Legitimacy — keep satisfied. | |||||||
| Dangerous | Power+Urgency — manage with care. | |||||||
| Dependent | Legitimacy+Urgency — need an ally with power. | |||||||
| Dormant | Power only — monitor. | |||||||
| Discretionary | Legitimacy only — goodwill. | |||||||
| Demanding | Urgency only — low effort. | |||||||
| Latent | none — minimal attention. |
Power-Interest
| POWER–INTEREST GRID | ||||||
| ID | Stakeholder | Category | Power | Interest | Quadrant | Recommended strategy |
| 1 | European Commission — DG GROW (industrial competitiveness) | Policy & regulatory | 5 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 2 | European Commission — DG RTD (research & innovation) | Policy & regulatory | 5 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 3 | European Commission — DG CNECT (digital/data spaces) | Policy & regulatory | 4 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 4 | European Parliament committees (ITRE; ENVI; IMCO) | Policy & regulatory | 4 | 2 | Keep Satisfied | Meet needs; consult on key decisions. |
| 5 | National ministries (industry, research, transport) | Policy & regulatory | 4 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 6 | EASA (aviation safety) | Policy & regulatory | 4 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 7 | EU Agency for Railways (ERA) | Policy & regulatory | 4 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 8 | EMSA (maritime safety) | Policy & regulatory | 3 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 9 | Joint Research Centre (JRC) | Policy & regulatory | 4 | 2 | Keep Satisfied | Meet needs; consult on key decisions. |
| 55 | National safety & infrastructure regulators | Policy & regulatory | 4 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 56 | Defence & dual-use procurement agencies | Policy & regulatory | 4 | 2 | Keep Satisfied | Meet needs; consult on key decisions. |
| 10 | European fatigue research groups (Fraunhofer LBF/IWM, PoliMi, TU Delft, NTUA) | Academia | 3 | 5 | Manage Closely | Engage fully; co-create; priority outreach. |
| 11 | Experimental fatigue laboratories | Academia | 3 | 4 | Manage Closely | Engage fully; co-create; priority outreach. |
| 12 | Materials-modelling & ML researchers | Academia | 2 | 4 | Keep Informed | Regular updates; leverage interest and goodwill. |
| 13 | Czech Academy of Sciences & national laboratories | Academia | 3 | 4 | Manage Closely | Engage fully; co-create; priority outreach. |
| 14 | Aerospace OEMs & engine makers (Airbus, Rolls-Royce, Safran) | Industry — end user | 4 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 15 | Energy & offshore operators (Siemens Energy, wind/offshore) | Industry — end user | 4 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 16 | Automotive & rail OEMs (Volvo, Stellantis, Alstom) | Industry — end user | 4 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 17 | Additive manufacturing firms | Industry — end user | 3 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 18 | Steel / welded-structure fabricators | Industry — end user | 3 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 19 | SMEs performing fatigue analysis | Industry — end user | 2 | 4 | Keep Informed | Regular updates; leverage interest and goodwill. |
| 20 | Large in-house fatigue groups | Industry — end user | 4 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 21 | Safety-critical infrastructure operators | Industry — end user | 4 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 51 | Shipbuilding & marine structures | Industry — end user | 3 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 52 | Heavy machinery & off-highway | Industry — end user | 3 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 53 | Civil infrastructure owners & engineers | Industry — end user | 3 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 22 | Dassault Systèmes (SIMULIA / fe-safe) | Solver developer | 4 | 2 | Keep Satisfied | Meet needs; consult on key decisions. |
| 23 | Ansys (nCode DesignLife) | Solver developer | 4 | 2 | Keep Satisfied | Meet needs; consult on key decisions. |
| 24 | Siemens / Hexagon / MSC | Solver developer | 4 | 2 | Keep Satisfied | Meet needs; consult on key decisions. |
| 25 | Open-source fatigue tool community (FatPy) | Solver developer | 2 | 4 | Keep Informed | Regular updates; leverage interest and goodwill. |
| 26 | ISO fatigue technical committees | Standards & certification | 5 | 2 | Keep Satisfied | Meet needs; consult on key decisions. |
| 27 | CEN / Eurocode committees (EN 1993-1-9) | Standards & certification | 5 | 2 | Keep Satisfied | Meet needs; consult on key decisions. |
| 28 | ASTM International (fatigue committees) | Standards & certification | 4 | 2 | Keep Satisfied | Meet needs; consult on key decisions. |
| 29 | NAFEMS | Standards & certification | 4 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 30 | FKM (FKM Guideline) | Standards & certification | 4 | 2 | Keep Satisfied | Meet needs; consult on key decisions. |
| 31 | Certification bodies (DNV, Lloyd's Register, Bureau Veritas, TÜV) | Standards & certification | 4 | 2 | Keep Satisfied | Meet needs; consult on key decisions. |
| 32 | EOSC / FAIR data infrastructure | Data & open science | 3 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 33 | OpenAIRE | Data & open science | 3 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 34 | Common European Data Space for Manufacturing (Catena-X, Factory-X, Aerospace-X) | Data & open science | 3 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 35 | FAIR-data experts & research software engineering communities | Data & open science | 2 | 4 | Keep Informed | Regular updates; leverage interest and goodwill. |
| 36 | EMMC (Eur. Materials Modelling Council) | Data & open science | 3 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 54 | National research data repositories | Data & open science | 3 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 37 | ESIS (European Structural Integrity Society) | Networks & dissemination | 4 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 38 | IIW (International Institute of Welding) | Networks & dissemination | 4 | 2 | Keep Satisfied | Meet needs; consult on key decisions. |
| 39 | European Federation of Corrosion (EFC) | Networks & dissemination | 3 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 40 | National engineering societies (DVM, SF2M, Gruppo Frattura, CSM, SPFIE) | Networks & dissemination | 3 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 41 | Fatigue conferences (ICF, Fatigue Design, ICEFA, ICMFF) | Networks & dissemination | 3 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 42 | Leading fatigue journals (Int. J. Fatigue; FFEMS) | Networks & dissemination | 3 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 43 | Online research communities (ResearchGate, iMechanica, LinkedIn) | Networks & dissemination | 2 | 4 | Keep Informed | Regular updates; leverage interest and goodwill. |
| 44 | GSS / Kos Science Forum platform | Networks & dissemination | 3 | 4 | Manage Closely | Engage fully; co-create; priority outreach. |
| 45 | Related COST Actions & Horizon Europe projects | Capacity & cross-cutting | 3 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 46 | Early-Career Investigators (PhDs, postdocs) | Capacity & cross-cutting | 2 | 4 | Keep Informed | Regular updates; leverage interest and goodwill. |
| 47 | Digital-twin / Industry 4.0 vendors | Capacity & cross-cutting | 3 | 3 | Manage Closely | Engage fully; co-create; priority outreach. |
| 48 | Standards test-data providers (specimen manufacturers) | Capacity & cross-cutting | 2 | 3 | Keep Informed | Regular updates; leverage interest and goodwill. |
| 49 | Educators / curriculum bodies | Capacity & cross-cutting | 2 | 3 | Keep Informed | Regular updates; leverage interest and goodwill. |
| 50 | Insurance bodies / underwriters | Capacity & cross-cutting | 3 | 2 | Keep Satisfied | Meet needs; consult on key decisions. |
Influence-Impact
| INFLUENCE–IMPACT GRID | ||||||
| ID | Stakeholder | Category | Influence | Impact | Quadrant | Recommended strategy |
| 1 | European Commission — DG GROW (industrial competitiveness) | Policy & regulatory | 5 | 5 | Critical Player | Engage as a primary partner; co-develop. |
| 2 | European Commission — DG RTD (research & innovation) | Policy & regulatory | 5 | 5 | Critical Player | Engage as a primary partner; co-develop. |
| 3 | European Commission — DG CNECT (digital/data spaces) | Policy & regulatory | 4 | 5 | Critical Player | Engage as a primary partner; co-develop. |
| 4 | European Parliament committees (ITRE; ENVI; IMCO) | Policy & regulatory | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 5 | National ministries (industry, research, transport) | Policy & regulatory | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 6 | EASA (aviation safety) | Policy & regulatory | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 7 | EU Agency for Railways (ERA) | Policy & regulatory | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 8 | EMSA (maritime safety) | Policy & regulatory | 3 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 9 | Joint Research Centre (JRC) | Policy & regulatory | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 55 | National safety & infrastructure regulators | Policy & regulatory | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 56 | Defence & dual-use procurement agencies | Policy & regulatory | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 10 | European fatigue research groups (Fraunhofer LBF/IWM, PoliMi, TU Delft, NTUA) | Academia | 4 | 5 | Critical Player | Engage as a primary partner; co-develop. |
| 11 | Experimental fatigue laboratories | Academia | 3 | 5 | Critical Player | Engage as a primary partner; co-develop. |
| 12 | Materials-modelling & ML researchers | Academia | 3 | 5 | Critical Player | Engage as a primary partner; co-develop. |
| 13 | Czech Academy of Sciences & national laboratories | Academia | 3 | 5 | Critical Player | Engage as a primary partner; co-develop. |
| 14 | Aerospace OEMs & engine makers (Airbus, Rolls-Royce, Safran) | Industry — end user | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 15 | Energy & offshore operators (Siemens Energy, wind/offshore) | Industry — end user | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 16 | Automotive & rail OEMs (Volvo, Stellantis, Alstom) | Industry — end user | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 17 | Additive manufacturing firms | Industry — end user | 3 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 18 | Steel / welded-structure fabricators | Industry — end user | 3 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 19 | SMEs performing fatigue analysis | Industry — end user | 2 | 4 | High Dependence | Support and secure; FABER relies on them. |
| 20 | Large in-house fatigue groups | Industry — end user | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 21 | Safety-critical infrastructure operators | Industry — end user | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 51 | Shipbuilding & marine structures | Industry — end user | 3 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 52 | Heavy machinery & off-highway | Industry — end user | 3 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 53 | Civil infrastructure owners & engineers | Industry — end user | 3 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 22 | Dassault Systèmes (SIMULIA / fe-safe) | Solver developer | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 23 | Ansys (nCode DesignLife) | Solver developer | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 24 | Siemens / Hexagon / MSC | Solver developer | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 25 | Open-source fatigue tool community (FatPy) | Solver developer | 3 | 5 | Critical Player | Engage as a primary partner; co-develop. |
| 26 | ISO fatigue technical committees | Standards & certification | 5 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 27 | CEN / Eurocode committees (EN 1993-1-9) | Standards & certification | 5 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 28 | ASTM International (fatigue committees) | Standards & certification | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 29 | NAFEMS | Standards & certification | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 30 | FKM (FKM Guideline) | Standards & certification | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 31 | Certification bodies (DNV, Lloyd's Register, Bureau Veritas, TÜV) | Standards & certification | 4 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 32 | EOSC / FAIR data infrastructure | Data & open science | 3 | 5 | Critical Player | Engage as a primary partner; co-develop. |
| 33 | OpenAIRE | Data & open science | 3 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 34 | Common European Data Space for Manufacturing (Catena-X, Factory-X, Aerospace-X) | Data & open science | 3 | 5 | Critical Player | Engage as a primary partner; co-develop. |
| 35 | FAIR-data experts & research software engineering communities | Data & open science | 3 | 5 | Critical Player | Engage as a primary partner; co-develop. |
| 36 | EMMC (Eur. Materials Modelling Council) | Data & open science | 3 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 54 | National research data repositories | Data & open science | 3 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 37 | ESIS (European Structural Integrity Society) | Networks & dissemination | 4 | 3 | Critical Player | Engage as a primary partner; co-develop. |
| 38 | IIW (International Institute of Welding) | Networks & dissemination | 4 | 3 | Critical Player | Engage as a primary partner; co-develop. |
| 39 | European Federation of Corrosion (EFC) | Networks & dissemination | 3 | 3 | Critical Player | Engage as a primary partner; co-develop. |
| 40 | National engineering societies (DVM, SF2M, Gruppo Frattura, CSM, SPFIE) | Networks & dissemination | 3 | 3 | Critical Player | Engage as a primary partner; co-develop. |
| 41 | Fatigue conferences (ICF, Fatigue Design, ICEFA, ICMFF) | Networks & dissemination | 3 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 42 | Leading fatigue journals (Int. J. Fatigue; FFEMS) | Networks & dissemination | 3 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 43 | Online research communities (ResearchGate, iMechanica, LinkedIn) | Networks & dissemination | 2 | 3 | High Dependence | Support and secure; FABER relies on them. |
| 44 | GSS / Kos Science Forum platform | Networks & dissemination | 3 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 45 | Related COST Actions & Horizon Europe projects | Capacity & cross-cutting | 3 | 3 | Critical Player | Engage as a primary partner; co-develop. |
| 46 | Early-Career Investigators (PhDs, postdocs) | Capacity & cross-cutting | 3 | 4 | Critical Player | Engage as a primary partner; co-develop. |
| 47 | Digital-twin / Industry 4.0 vendors | Capacity & cross-cutting | 3 | 3 | Critical Player | Engage as a primary partner; co-develop. |
| 48 | Standards test-data providers (specimen manufacturers) | Capacity & cross-cutting | 2 | 3 | High Dependence | Support and secure; FABER relies on them. |
| 49 | Educators / curriculum bodies | Capacity & cross-cutting | 2 | 3 | High Dependence | Support and secure; FABER relies on them. |
| 50 | Insurance bodies / underwriters | Capacity & cross-cutting | 3 | 3 | Critical Player | Engage as a primary partner; co-develop. |
| QUADRANT LEGEND | ||||||
| Critical Player | High influence + high impact: primary partner. | |||||
| Influencer | High influence, lower dependence: leverage their reach. | |||||
| High Dependence | FABER depends on them though their field sway is lower: secure them. | |||||
| Peripheral | Low on both: monitor lightly. |
Engagement
| ENGAGEMENT SPECTRUM (IAP2) | |||||||
| 1 Inform · 2 Consult · 3 Involve · 4 Collaborate · 5 Empower. Gap = target − current. | |||||||
| ID | Stakeholder | Current level | Target level | Gap | Current | Target | Action to close gap |
| 1 | European Commission — DG GROW (industrial competitiveness) | 2 | 4 | 2 | Consult | Collaborate | Plan a concrete step up (workshop, role, co-authorship). |
| 2 | European Commission — DG RTD (research & innovation) | 2 | 4 | 2 | Consult | Collaborate | Plan a concrete step up (workshop, role, co-authorship). |
| 3 | European Commission — DG CNECT (digital/data spaces) | 1 | 4 | 3 | Inform | Collaborate | Priority: dedicated outreach and a formal step up. |
| 4 | European Parliament committees (ITRE; ENVI; IMCO) | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 5 | National ministries (industry, research, transport) | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 6 | EASA (aviation safety) | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 7 | EU Agency for Railways (ERA) | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 8 | EMSA (maritime safety) | 1 | 2 | 1 | Inform | Consult | Plan a concrete step up (workshop, role, co-authorship). |
| 9 | Joint Research Centre (JRC) | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 55 | National safety & infrastructure regulators | 1 | 2 | 1 | Inform | Consult | Plan a concrete step up (workshop, role, co-authorship). |
| 56 | Defence & dual-use procurement agencies | 1 | 2 | 1 | Inform | Consult | Plan a concrete step up (workshop, role, co-authorship). |
| 10 | European fatigue research groups (Fraunhofer LBF/IWM, PoliMi, TU Delft, NTUA) | 3 | 5 | 2 | Involve | Empower | Plan a concrete step up (workshop, role, co-authorship). |
| 11 | Experimental fatigue laboratories | 2 | 5 | 3 | Consult | Empower | Priority: dedicated outreach and a formal step up. |
| 12 | Materials-modelling & ML researchers | 2 | 4 | 2 | Consult | Collaborate | Plan a concrete step up (workshop, role, co-authorship). |
| 13 | Czech Academy of Sciences & national laboratories | 2 | 4 | 2 | Consult | Collaborate | Plan a concrete step up (workshop, role, co-authorship). |
| 14 | Aerospace OEMs & engine makers (Airbus, Rolls-Royce, Safran) | 2 | 4 | 2 | Consult | Collaborate | Plan a concrete step up (workshop, role, co-authorship). |
| 15 | Energy & offshore operators (Siemens Energy, wind/offshore) | 2 | 4 | 2 | Consult | Collaborate | Plan a concrete step up (workshop, role, co-authorship). |
| 16 | Automotive & rail OEMs (Volvo, Stellantis, Alstom) | 2 | 4 | 2 | Consult | Collaborate | Plan a concrete step up (workshop, role, co-authorship). |
| 17 | Additive manufacturing firms | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 18 | Steel / welded-structure fabricators | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 19 | SMEs performing fatigue analysis | 2 | 4 | 2 | Consult | Collaborate | Plan a concrete step up (workshop, role, co-authorship). |
| 20 | Large in-house fatigue groups | 2 | 3 | 1 | Consult | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 21 | Safety-critical infrastructure operators | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 51 | Shipbuilding & marine structures | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 52 | Heavy machinery & off-highway | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 53 | Civil infrastructure owners & engineers | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 22 | Dassault Systèmes (SIMULIA / fe-safe) | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 23 | Ansys (nCode DesignLife) | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 24 | Siemens / Hexagon / MSC | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 25 | Open-source fatigue tool community (FatPy) | 2 | 5 | 3 | Consult | Empower | Priority: dedicated outreach and a formal step up. |
| 26 | ISO fatigue technical committees | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 27 | CEN / Eurocode committees (EN 1993-1-9) | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 28 | ASTM International (fatigue committees) | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 29 | NAFEMS | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 30 | FKM (FKM Guideline) | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 31 | Certification bodies (DNV, Lloyd's Register, Bureau Veritas, TÜV) | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 32 | EOSC / FAIR data infrastructure | 1 | 4 | 3 | Inform | Collaborate | Priority: dedicated outreach and a formal step up. |
| 33 | OpenAIRE | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 34 | Common European Data Space for Manufacturing (Catena-X, Factory-X, Aerospace-X) | 1 | 4 | 3 | Inform | Collaborate | Priority: dedicated outreach and a formal step up. |
| 35 | FAIR-data experts & research software engineering communities | 2 | 4 | 2 | Consult | Collaborate | Plan a concrete step up (workshop, role, co-authorship). |
| 36 | EMMC (Eur. Materials Modelling Council) | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 54 | National research data repositories | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 37 | ESIS (European Structural Integrity Society) | 1 | 4 | 3 | Inform | Collaborate | Priority: dedicated outreach and a formal step up. |
| 38 | IIW (International Institute of Welding) | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 39 | European Federation of Corrosion (EFC) | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 40 | National engineering societies (DVM, SF2M, Gruppo Frattura, CSM, SPFIE) | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 41 | Fatigue conferences (ICF, Fatigue Design, ICEFA, ICMFF) | 2 | 4 | 2 | Consult | Collaborate | Plan a concrete step up (workshop, role, co-authorship). |
| 42 | Leading fatigue journals (Int. J. Fatigue; FFEMS) | 2 | 4 | 2 | Consult | Collaborate | Plan a concrete step up (workshop, role, co-authorship). |
| 43 | Online research communities (ResearchGate, iMechanica, LinkedIn) | 2 | 3 | 1 | Consult | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 44 | GSS / Kos Science Forum platform | 2 | 4 | 2 | Consult | Collaborate | Plan a concrete step up (workshop, role, co-authorship). |
| 45 | Related COST Actions & Horizon Europe projects | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 46 | Early-Career Investigators (PhDs, postdocs) | 2 | 5 | 3 | Consult | Empower | Priority: dedicated outreach and a formal step up. |
| 47 | Digital-twin / Industry 4.0 vendors | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 48 | Standards test-data providers (specimen manufacturers) | 1 | 3 | 2 | Inform | Involve | Plan a concrete step up (workshop, role, co-authorship). |
| 49 | Educators / curriculum bodies | 1 | 2 | 1 | Inform | Consult | Plan a concrete step up (workshop, role, co-authorship). |
| 50 | Insurance bodies / underwriters | 1 | 2 | 1 | Inform | Consult | Plan a concrete step up (workshop, role, co-authorship). |
SWOT
| SWOT — PER STAKEHOLDER (RELATIVE TO FABER) | |||||||||||
| WEIGHTS (edit these; default +1.4 S, −1 W, +1.6 O, −1 T) | |||||||||||
| S weight | 1.4 | W weight | -1 | O weight | 1.6 | T weight | -1 | ||||
| ID | Stakeholder | Category | Strength (note) | S | Weakness (note) | W | Opportunity (note) | O | Threat (note) | T | SWOT score (0-1) |
| 1 | European Commission — DG GROW (industrial competitiveness) | Policy & regulatory | Confer legitimacy and open policy and funding channels. | 4 | Slow-moving and hard to access; not technically engaged in benchmarking. | 3 | Engaging them embeds FABER in EU policy, data spaces and funding. | 5 | If they set rules without FABER input, outputs may be sidelined. | 2 | 0.78 |
| 2 | European Commission — DG RTD (research & innovation) | Policy & regulatory | Confer legitimacy and open policy and funding channels. | 4 | Slow-moving and hard to access; not technically engaged in benchmarking. | 3 | Engaging them embeds FABER in EU policy, data spaces and funding. | 5 | If they set rules without FABER input, outputs may be sidelined. | 2 | 0.78 |
| 3 | European Commission — DG CNECT (digital/data spaces) | Policy & regulatory | Confer legitimacy and open policy and funding channels. | 4 | Slow-moving and hard to access; not technically engaged in benchmarking. | 3 | Engaging them embeds FABER in EU policy, data spaces and funding. | 5 | If they set rules without FABER input, outputs may be sidelined. | 2 | 0.78 |
| 4 | European Parliament committees (ITRE; ENVI; IMCO) | Policy & regulatory | Confer legitimacy and open policy and funding channels. | 4 | Slow-moving and hard to access; not technically engaged in benchmarking. | 3 | Engaging them embeds FABER in EU policy, data spaces and funding. | 5 | If they set rules without FABER input, outputs may be sidelined. | 2 | 0.78 |
| 5 | National ministries (industry, research, transport) | Policy & regulatory | Confer legitimacy and open policy and funding channels. | 4 | Slow-moving and hard to access; not technically engaged in benchmarking. | 3 | Engaging them embeds FABER in EU policy, data spaces and funding. | 5 | If they set rules without FABER input, outputs may be sidelined. | 2 | 0.78 |
| 6 | EASA (aviation safety) | Policy & regulatory | Confer legitimacy and open policy and funding channels. | 4 | Slow-moving and hard to access; not technically engaged in benchmarking. | 3 | Engaging them embeds FABER in EU policy, data spaces and funding. | 5 | If they set rules without FABER input, outputs may be sidelined. | 2 | 0.78 |
| 7 | EU Agency for Railways (ERA) | Policy & regulatory | Confer legitimacy and open policy and funding channels. | 4 | Slow-moving and hard to access; not technically engaged in benchmarking. | 3 | Engaging them embeds FABER in EU policy, data spaces and funding. | 5 | If they set rules without FABER input, outputs may be sidelined. | 2 | 0.78 |
| 8 | EMSA (maritime safety) | Policy & regulatory | Confer legitimacy and open policy and funding channels. | 4 | Slow-moving and hard to access; not technically engaged in benchmarking. | 3 | Engaging them embeds FABER in EU policy, data spaces and funding. | 5 | If they set rules without FABER input, outputs may be sidelined. | 2 | 0.78 |
| 9 | Joint Research Centre (JRC) | Policy & regulatory | Confer legitimacy and open policy and funding channels. | 4 | Slow-moving and hard to access; not technically engaged in benchmarking. | 3 | Engaging them embeds FABER in EU policy, data spaces and funding. | 5 | If they set rules without FABER input, outputs may be sidelined. | 2 | 0.78 |
| 55 | National safety & infrastructure regulators | Policy & regulatory | Confer legitimacy and open policy and funding channels. | 4 | Slow-moving and hard to access; not technically engaged in benchmarking. | 3 | Engaging them embeds FABER in EU policy, data spaces and funding. | 5 | If they set rules without FABER input, outputs may be sidelined. | 2 | 0.78 |
| 56 | Defence & dual-use procurement agencies | Policy & regulatory | Confer legitimacy and open policy and funding channels. | 4 | Slow-moving and hard to access; not technically engaged in benchmarking. | 3 | Engaging them embeds FABER in EU policy, data spaces and funding. | 5 | If they set rules without FABER input, outputs may be sidelined. | 2 | 0.78 |
| 10 | European fatigue research groups (Fraunhofer LBF/IWM, PoliMi, TU Delft, NTUA) | Academia | Hold and validate the experimental data; the Action's technical core. | 5 | Limited reach into industrial practice and decision channels. | 3 | Co-developed methods and publications build the benchmark base. | 4 | Fragmented incentives; data may stay dispersed if not coordinated. | 2 | 0.77 |
| 11 | Experimental fatigue laboratories | Academia | Hold and validate the experimental data; the Action's technical core. | 5 | Limited reach into industrial practice and decision channels. | 3 | Co-developed methods and publications build the benchmark base. | 4 | Fragmented incentives; data may stay dispersed if not coordinated. | 2 | 0.77 |
| 12 | Materials-modelling & ML researchers | Academia | Hold and validate the experimental data; the Action's technical core. | 5 | Limited reach into industrial practice and decision channels. | 3 | Co-developed methods and publications build the benchmark base. | 4 | Fragmented incentives; data may stay dispersed if not coordinated. | 2 | 0.77 |
| 13 | Czech Academy of Sciences & national laboratories | Academia | Hold and validate the experimental data; the Action's technical core. | 5 | Limited reach into industrial practice and decision channels. | 3 | Co-developed methods and publications build the benchmark base. | 4 | Fragmented incentives; data may stay dispersed if not coordinated. | 2 | 0.77 |
| 14 | Aerospace OEMs & engine makers (Airbus, Rolls-Royce, Safran) | Industry — end user | Provide real validation cases and the adoption that proves impact. | 4 | Guard proprietary data; cautious about open benchmarking. | 3 | Adoption turns FABER into industrial practice and sustains it. | 5 | Satisfaction with the status quo can slow uptake. | 3 | 0.73 |
| 15 | Energy & offshore operators (Siemens Energy, wind/offshore) | Industry — end user | Provide real validation cases and the adoption that proves impact. | 4 | Guard proprietary data; cautious about open benchmarking. | 3 | Adoption turns FABER into industrial practice and sustains it. | 5 | Satisfaction with the status quo can slow uptake. | 3 | 0.73 |
| 16 | Automotive & rail OEMs (Volvo, Stellantis, Alstom) | Industry — end user | Provide real validation cases and the adoption that proves impact. | 4 | Guard proprietary data; cautious about open benchmarking. | 3 | Adoption turns FABER into industrial practice and sustains it. | 5 | Satisfaction with the status quo can slow uptake. | 3 | 0.73 |
| 17 | Additive manufacturing firms | Industry — end user | Provide real validation cases and the adoption that proves impact. | 4 | Guard proprietary data; cautious about open benchmarking. | 3 | Adoption turns FABER into industrial practice and sustains it. | 5 | Satisfaction with the status quo can slow uptake. | 3 | 0.73 |
| 18 | Steel / welded-structure fabricators | Industry — end user | Provide real validation cases and the adoption that proves impact. | 4 | Guard proprietary data; cautious about open benchmarking. | 3 | Adoption turns FABER into industrial practice and sustains it. | 5 | Satisfaction with the status quo can slow uptake. | 3 | 0.73 |
| 19 | SMEs performing fatigue analysis | Industry — end user | Individually small, but the segment FABER is built to serve. | 2 | Hard to reach at scale; FABER lacks a dedicated SME channel. | 4 | Validated benchmarks give SMEs what they cannot build alone. | 4 | May default to unverified commercial tools regardless. | 2 | 0.51 |
| 20 | Large in-house fatigue groups | Industry — end user | Deep in-house benchmarking experience and resources. | 3 | Keep results private; limited willingness to share. | 3 | Neutral cross-validation against their private benchmarks. | 2 | Status-quo defenders; satisfied without FABER. | 4 | 0.37 |
| 21 | Safety-critical infrastructure operators | Industry — end user | Provide real validation cases and the adoption that proves impact. | 4 | Guard proprietary data; cautious about open benchmarking. | 3 | Adoption turns FABER into industrial practice and sustains it. | 5 | Satisfaction with the status quo can slow uptake. | 3 | 0.73 |
| 51 | Shipbuilding & marine structures | Industry — end user | Provide real validation cases and the adoption that proves impact. | 4 | Guard proprietary data; cautious about open benchmarking. | 3 | Adoption turns FABER into industrial practice and sustains it. | 5 | Satisfaction with the status quo can slow uptake. | 3 | 0.73 |
| 52 | Heavy machinery & off-highway | Industry — end user | Provide real validation cases and the adoption that proves impact. | 4 | Guard proprietary data; cautious about open benchmarking. | 3 | Adoption turns FABER into industrial practice and sustains it. | 5 | Satisfaction with the status quo can slow uptake. | 3 | 0.73 |
| 53 | Civil infrastructure owners & engineers | Industry — end user | Provide real validation cases and the adoption that proves impact. | 4 | Guard proprietary data; cautious about open benchmarking. | 3 | Adoption turns FABER into industrial practice and sustains it. | 5 | Satisfaction with the status quo can slow uptake. | 3 | 0.73 |
| 22 | Dassault Systèmes (SIMULIA / fe-safe) | Solver developer | Control the tools that would carry benchmarks into practice. | 3 | Resist open benchmarking; deny warranty; competitive secrecy. | 4 | If converted, they validate FABER across the whole market. | 4 | Can actively block public benchmarking through licence clauses. | 5 | 0.43 |
| 23 | Ansys (nCode DesignLife) | Solver developer | Control the tools that would carry benchmarks into practice. | 3 | Resist open benchmarking; deny warranty; competitive secrecy. | 4 | If converted, they validate FABER across the whole market. | 4 | Can actively block public benchmarking through licence clauses. | 5 | 0.43 |
| 24 | Siemens / Hexagon / MSC | Solver developer | Control the tools that would carry benchmarks into practice. | 3 | Resist open benchmarking; deny warranty; competitive secrecy. | 4 | If converted, they validate FABER across the whole market. | 4 | Can actively block public benchmarking through licence clauses. | 5 | 0.43 |
| 25 | Open-source fatigue tool community (FatPy) | Solver developer | The shared, validated open-source base the community has lacked. | 5 | Relies on sustained volunteer and maintainer effort. | 2 | FatPy can become the reference implementation for the field. | 4 | Minimal: an open asset, not a competitive blocker. | 1 | 0.87 |
| 26 | ISO fatigue technical committees | Standards & certification | Provide the normative pathway and reporting conventions. | 4 | Slow consensus processes; FABER must align, not dictate. | 2 | FABER outputs can become EN or ISO references. | 5 | If they standardise without FABER, the Action loses authority. | 2 | 0.83 |
| 27 | CEN / Eurocode committees (EN 1993-1-9) | Standards & certification | Provide the normative pathway and reporting conventions. | 4 | Slow consensus processes; FABER must align, not dictate. | 2 | FABER outputs can become EN or ISO references. | 5 | If they standardise without FABER, the Action loses authority. | 2 | 0.83 |
| 28 | ASTM International (fatigue committees) | Standards & certification | Provide the normative pathway and reporting conventions. | 4 | Slow consensus processes; FABER must align, not dictate. | 2 | FABER outputs can become EN or ISO references. | 5 | If they standardise without FABER, the Action loses authority. | 2 | 0.83 |
| 29 | NAFEMS | Standards & certification | Provide the normative pathway and reporting conventions. | 4 | Slow consensus processes; FABER must align, not dictate. | 2 | FABER outputs can become EN or ISO references. | 5 | If they standardise without FABER, the Action loses authority. | 2 | 0.83 |
| 30 | FKM (FKM Guideline) | Standards & certification | Provide the normative pathway and reporting conventions. | 4 | Slow consensus processes; FABER must align, not dictate. | 2 | FABER outputs can become EN or ISO references. | 5 | If they standardise without FABER, the Action loses authority. | 2 | 0.83 |
| 31 | Certification bodies (DNV, Lloyd's Register, Bureau Veritas, TÜV) | Standards & certification | Provide the normative pathway and reporting conventions. | 4 | Slow consensus processes; FABER must align, not dictate. | 2 | FABER outputs can become EN or ISO references. | 5 | If they standardise without FABER, the Action loses authority. | 2 | 0.83 |
| 32 | EOSC / FAIR data infrastructure | Data & open science | FAIR infrastructure, DOIs and federated query for the repository. | 4 | Dependence on external platforms and their governance. | 2 | Anchor FABER in EOSC and the Manufacturing Data Space. | 4 | Misalignment with data-sovereignty rules could limit reuse. | 2 | 0.75 |
| 33 | OpenAIRE | Data & open science | FAIR infrastructure, DOIs and federated query for the repository. | 4 | Dependence on external platforms and their governance. | 2 | Anchor FABER in EOSC and the Manufacturing Data Space. | 4 | Misalignment with data-sovereignty rules could limit reuse. | 2 | 0.75 |
| 34 | Common European Data Space for Manufacturing (Catena-X, Factory-X, Aerospace-X) | Data & open science | FAIR infrastructure, DOIs and federated query for the repository. | 4 | Dependence on external platforms and their governance. | 2 | Anchor FABER in EOSC and the Manufacturing Data Space. | 4 | Misalignment with data-sovereignty rules could limit reuse. | 2 | 0.75 |
| 35 | FAIR-data experts & research software engineering communities | Data & open science | FAIR infrastructure, DOIs and federated query for the repository. | 4 | Dependence on external platforms and their governance. | 2 | Anchor FABER in EOSC and the Manufacturing Data Space. | 4 | Misalignment with data-sovereignty rules could limit reuse. | 2 | 0.75 |
| 36 | EMMC (Eur. Materials Modelling Council) | Data & open science | FAIR infrastructure, DOIs and federated query for the repository. | 4 | Dependence on external platforms and their governance. | 2 | Anchor FABER in EOSC and the Manufacturing Data Space. | 4 | Misalignment with data-sovereignty rules could limit reuse. | 2 | 0.75 |
| 54 | National research data repositories | Data & open science | FAIR infrastructure, DOIs and federated query for the repository. | 4 | Dependence on external platforms and their governance. | 2 | Anchor FABER in EOSC and the Manufacturing Data Space. | 4 | Misalignment with data-sovereignty rules could limit reuse. | 2 | 0.75 |
| 37 | ESIS (European Structural Integrity Society) | Networks & dissemination | Reach, consensus building and FABEST visibility. | 4 | Low control over the message; engagement is voluntary. | 2 | Amplify uptake and recruit new contributors. | 3 | Competing initiatives could fragment attention. | 2 | 0.67 |
| 38 | IIW (International Institute of Welding) | Networks & dissemination | Reach, consensus building and FABEST visibility. | 4 | Low control over the message; engagement is voluntary. | 2 | Amplify uptake and recruit new contributors. | 3 | Competing initiatives could fragment attention. | 2 | 0.67 |
| 39 | European Federation of Corrosion (EFC) | Networks & dissemination | Reach, consensus building and FABEST visibility. | 4 | Low control over the message; engagement is voluntary. | 2 | Amplify uptake and recruit new contributors. | 3 | Competing initiatives could fragment attention. | 2 | 0.67 |
| 40 | National engineering societies (DVM, SF2M, Gruppo Frattura, CSM, SPFIE) | Networks & dissemination | Reach, consensus building and FABEST visibility. | 4 | Low control over the message; engagement is voluntary. | 2 | Amplify uptake and recruit new contributors. | 3 | Competing initiatives could fragment attention. | 2 | 0.67 |
| 41 | Fatigue conferences (ICF, Fatigue Design, ICEFA, ICMFF) | Networks & dissemination | Reach, consensus building and FABEST visibility. | 4 | Low control over the message; engagement is voluntary. | 2 | Amplify uptake and recruit new contributors. | 3 | Competing initiatives could fragment attention. | 2 | 0.67 |
| 42 | Leading fatigue journals (Int. J. Fatigue; FFEMS) | Networks & dissemination | Reach, consensus building and FABEST visibility. | 4 | Low control over the message; engagement is voluntary. | 2 | Amplify uptake and recruit new contributors. | 3 | Competing initiatives could fragment attention. | 2 | 0.67 |
| 43 | Online research communities (ResearchGate, iMechanica, LinkedIn) | Networks & dissemination | Fast, low-cost amplification of FABER's reach. | 2 | Low control over message and audience quality. | 4 | Informal recruitment and community uptake. | 3 | Noise and misinformation risk if unmanaged. | 2 | 0.43 |
| 44 | GSS / Kos Science Forum platform | Networks & dissemination | Reach, consensus building and FABEST visibility. | 4 | Low control over the message; engagement is voluntary. | 2 | Amplify uptake and recruit new contributors. | 3 | Competing initiatives could fragment attention. | 2 | 0.67 |
| 45 | Related COST Actions & Horizon Europe projects | Capacity & cross-cutting | Next-generation contributors and successor-project partners. | 3 | Early-career turnover creates a continuity risk. | 2 | Build the pipeline and a successor consortium (PASP). | 4 | Loss of trained people if no sustainability path exists. | 2 | 0.68 |
| 46 | Early-Career Investigators (PhDs, postdocs) | Capacity & cross-cutting | Next-generation contributors and successor-project partners. | 3 | Early-career turnover creates a continuity risk. | 2 | Build the pipeline and a successor consortium (PASP). | 4 | Loss of trained people if no sustainability path exists. | 2 | 0.68 |
| 47 | Digital-twin / Industry 4.0 vendors | Capacity & cross-cutting | Next-generation contributors and successor-project partners. | 3 | Early-career turnover creates a continuity risk. | 2 | Build the pipeline and a successor consortium (PASP). | 4 | Loss of trained people if no sustainability path exists. | 2 | 0.68 |
| 48 | Standards test-data providers (specimen manufacturers) | Capacity & cross-cutting | Next-generation contributors and successor-project partners. | 3 | Early-career turnover creates a continuity risk. | 2 | Build the pipeline and a successor consortium (PASP). | 4 | Loss of trained people if no sustainability path exists. | 2 | 0.68 |
| 49 | Educators / curriculum bodies | Capacity & cross-cutting | Next-generation contributors and successor-project partners. | 3 | Early-career turnover creates a continuity risk. | 2 | Build the pipeline and a successor consortium (PASP). | 4 | Loss of trained people if no sustainability path exists. | 2 | 0.68 |
| 50 | Insurance bodies / underwriters | Capacity & cross-cutting | Next-generation contributors and successor-project partners. | 3 | Early-career turnover creates a continuity risk. | 2 | Build the pipeline and a successor consortium (PASP). | 4 | Loss of trained people if no sustainability path exists. | 2 | 0.68 |
| SUMMARY (averages across all stakeholders) | |||||||||||
| Avg S | 3.84 | ||||||||||
| Avg W | 2.63 | ||||||||||
| Avg O | 4.29 | ||||||||||
| Avg T | 2.34 | ||||||||||
| Mean SWOT score | 0.71 |
Comms Plan
| COMMUNICATION & ENGAGEMENT PLAN | ||||||
| ID | Stakeholder / segment | Key message | Channel(s) | Frequency | KPI / success metric | Linked deliverable |
| 1 | European Commission — DG GROW (industrial competitiveness) | Validated fatigue prediction strengthens EU industrial competitiveness and safe, efficient design. | Policy briefs; Brussels meetings; position paper | Per milestone | Meeting/briefing accepted; cited in a policy doc | D-policy |
| 2 | European Commission — DG RTD (research & innovation) | FABER is a candidate research-infrastructure and Horizon follow-on with clear industrial impact. | Horizon NCP; concept notes; EOSC links | Per call | Concept note submitted; call alignment | D-policy |
| 3 | European Commission — DG CNECT (digital/data spaces) | FABER's WG1 record format is ready to feed a Manufacturing-X connector under Gaia-X. | Data-space governance fora; technical workshops | Per milestone | FABER referenced in a data-space pilot | D-policy |
| 4 | European Parliament committees (ITRE; ENVI; IMCO) | Open fatigue benchmarking serves safety, competitiveness and the green/industrial agenda. | Invitations; briefings; stakeholder meetings | Annual | Committee contact engaged | D-policy |
| 5 | National ministries (industry, research, transport) | National competitiveness and safety benefit from validated, shared fatigue benchmarks. | Permanent Representations; national delegates | Annual | National co-funding or endorsement | D-policy |
| 6 | EASA (aviation safety) | Validated LCF prediction supports airworthiness and life-limiting-part assurance. | Sectoral briefings; technical liaison | Annual | Regulator informed of benchmark evidence | D-policy |
| 7 | EU Agency for Railways (ERA) | Validated fatigue codes support rail safety and interoperability. | Sectoral briefings | Annual | Regulator informed | D-policy |
| 8 | EMSA (maritime safety) | Validated fatigue prediction supports maritime structural-integrity assurance. | Sectoral briefings | Annual | Regulator informed | D-policy |
| 9 | Joint Research Centre (JRC) | JRC's SSbD and data infrastructure align with FABER's repository and standards aims. | JRC liaison; joint workshop | Per milestone | JRC engagement on repository/SSbD | D-policy |
| 55 | National safety & infrastructure regulators | National regulators connect FABER evidence to implementation realities across Member States. | National authorities; sector channels | Annual | National regulator informed | D-policy |
| 56 | Defence & dual-use procurement agencies | Defence assets depend on fatigue-critical structures; validated prediction supports procurement assurance. | EDA; national procurement liaison | Annual | Dual-use relevance recognised | D-policy |
| 10 | European fatigue research groups (Fraunhofer LBF/IWM, PoliMi, TU Delft, NTUA) | FABER gives you curated, citable benchmark data and a route to validated methods. | WG meetings; STSMs; Training Schools | Per milestone | Datasets contributed; methods validated | D4·D9 |
| 11 | Experimental fatigue laboratories | FABER shares the testing burden and gives your lab recognition and influence on results. | WG3 outreach; competition calls | Per round | Labs committed to FABEST campaigns | D3·D8 |
| 12 | Materials-modelling & ML researchers | FABER's large, curated data sets are the precondition for trustworthy ML in fatigue. | WG2.3 channel; EMMC links | Per milestone | ML validation studies on FABER data | D6·D7 |
| 13 | Czech Academy of Sciences & national laboratories | Your historical data and curation capacity help build a credible benchmark base. | WG1 workshops; Data Committee | Per milestone | Data and curation input secured | D1·D5 |
| 14 | Aerospace OEMs & engine makers (Airbus, Rolls-Royce, Safran) | Early access to validated benchmarks de-risks life-limiting fatigue decisions. | Durability-engineering leads; FABEST | Per milestone | Benchmark cases & early adoption | D4·D9 |
| 15 | Energy & offshore operators (Siemens Energy, wind/offshore) | Validated methods underpin 20-25 year design lives on ever-larger structures. | Sector forums; co-developed cases | Per milestone | Sector benchmark cases co-developed | D4·D9 |
| 16 | Automotive & rail OEMs (Volvo, Stellantis, Alstom) | Shared benchmarks lower the cost and raise the confidence of durability sign-off. | National societies; Tier-1 suppliers | Per milestone | Use cases & tacit endorsement | D4·D9 |
| 17 | Additive manufacturing firms | FABER targets the AM fatigue behaviours classical S-N data do not yet cover. | WG5.1 task; AM networks | Per milestone | AM use cases contributed | D14 |
| 18 | Steel / welded-structure fabricators | Welded-joint benchmarks address the residual-stress and HAZ behaviours you face. | WG5.3 task; IIW links | Per milestone | Welded-joint cases & data | D14 |
| 19 | SMEs performing fatigue analysis | FABER gives SMEs the neutral validation they cannot afford to build alone. | Resellers; national societies; FatPy | Per milestone | SME adoption & demand signal | D2·D9 |
| 20 | Large in-house fatigue groups | FABER offers neutral cross-validation against your private benchmarks. | Direct corporate liaison | Per milestone | Cross-validation engagement | D4 |
| 21 | Safety-critical infrastructure operators | Validated fatigue prediction underpins asset-integrity and life-extension decisions. | Operator forums; case calls | Per milestone | Operator problem definitions | D14 |
| 51 | Shipbuilding & marine structures | Shipbuilding fatigue, dominated by welded joints and variable seas, is squarely in WG5 territory. | Class societies; WG5.3 links | Per milestone | Marine use cases contributed | D14 |
| 52 | Heavy machinery & off-highway | Off-highway duty cycles are exactly the variable-amplitude, multiaxial cases benchmarks lack. | OEM durability teams | Per milestone | Duty-cycle use cases | D4·D14 |
| 53 | Civil infrastructure owners & engineers | Civil fatigue assessment runs on Eurocode 3; FABER benchmarks can calibrate it. | Engineering institutions; CEN links | Per milestone | Civil use cases & code link | D4 |
| 22 | Dassault Systèmes (SIMULIA / fe-safe) | FABEST is a credibility opportunity: prove your solver against neutral benchmarks. | Dedicated developer meeting; resellers | Per round | Developer participation in FABEST | D8·D10 |
| 23 | Ansys (nCode DesignLife) | Anonymised benchmarking lets you demonstrate quality without exposing IP. | Dedicated developer meeting | Per round | Developer participation | D8·D10 |
| 24 | Siemens / Hexagon / MSC | Open benchmarking and FatPy as a shared base strengthen the whole field. | Developer meeting; professional networks | Per round | Developer participation | D8·D10 |
| 25 | Open-source fatigue tool community (FatPy) | FatPy is the shared, validated reference base the community has lacked. | GitHub governance; FatPy workshops | Continuous | Contributors & releases | D-FatPy |
| 26 | ISO fatigue technical committees | FABER outputs are pre-normative input ISO committees can consolidate. | TC liaison; technical contributions | Annual | Pre-normative input accepted | D-std |
| 27 | CEN / Eurocode committees (EN 1993-1-9) | A CEN Workshop Agreement seeded by FABER opens the route to an EN standard. | CWA proposal; CEN liaison | Annual | CWA scoped/launched | D-std |
| 28 | ASTM International (fatigue committees) | Aligning FABER reporting with ASTM standards lifts comparability and uptake. | Committee chairs; alignment notes | Annual | Reporting alignment achieved | D-std |
| 29 | NAFEMS | FABER is the fatigue analogue of the V&V role NAFEMS pioneered for FE. | Joint workshop; liaison | Per milestone | Joint workshop held | D-std |
| 30 | FKM (FKM Guideline) | FABER benchmarks can calibrate and validate FKM acceptance criteria. | Guideline working groups | Annual | Acceptance-criteria alignment | D-std |
| 31 | Certification bodies (DNV, Lloyd's Register, Bureau Veritas, TÜV) | Benchmark evidence supports qualification and reduces liability, especially offshore. | Certifier liaison; case studies | Per milestone | Certifier acceptance of evidence | D-std |
| 32 | EOSC / FAIR data infrastructure | EOSC provides the FAIR hosting and DOI minting the Repository needs. | EOSC onboarding; RDM networks | Per milestone | Repository FAIR-aligned; DOIs minted | D5 |
| 33 | OpenAIRE | OpenAIRE makes FABER outputs discoverable and citable across Europe. | Metadata alignment | Per milestone | Outputs harvested & citable | D5 |
| 34 | Common European Data Space for Manufacturing (Catena-X, Factory-X, Aerospace-X) | FABER's record format is ready to feed a Manufacturing-X connector tomorrow. | Data-space pilots; connector spec | Per milestone | Pilot connector referencing FABER | D5 |
| 35 | FAIR-data experts & research software engineering communities | RSE and FAIR practitioners turn principles into a working, governed repository. | FatPy community; RDM networks | Continuous | FAIR & OSS practice embedded | D-FatPy |
| 36 | EMMC (Eur. Materials Modelling Council) | EMMC complements FABER and is a recruitment and PASP-partner channel. | EMMC WGs; joint activities | Per milestone | Joint activity / recruitment | D-PASP |
| 54 | National research data repositories | National repositories provide federated, persistent hosting for FABER data feeds. | National RDM bodies; EOSC nodes | Per milestone | National data feeds connected | D5 |
| 37 | ESIS (European Structural Integrity Society) | ESIS is the primary European dissemination and standards-alignment channel. | Co-organised sessions; FABEST | Per milestone | Sessions co-organised | D-diss |
| 38 | IIW (International Institute of Welding) | IIW is the natural home for welded-joint fatigue benchmark categories. | IIW commissions; joint work | Annual | Welded-joint alignment | D14 |
| 39 | European Federation of Corrosion (EFC) | EFC connects FABER to environmental and corrosion-fatigue communities. | EFC events; WG5 links | Annual | Environmental-fatigue input | D14 |
| 40 | National engineering societies (DVM, SF2M, Gruppo Frattura, CSM, SPFIE) | National societies are low-effort, high-reach relays to industry and academia. | Society newsletters; talks | Per milestone | National dissemination reach | D-diss |
| 41 | Fatigue conferences (ICF, Fatigue Design, ICEFA, ICMFF) | Conferences give FABEST visibility and recruit new contributors. | Special sessions; competition awards | Per event | FABEST sessions & awards | D-diss |
| 42 | Leading fatigue journals (Int. J. Fatigue; FFEMS) | Journals carry FABER's survey, benchmark and competition papers. | Special issues tied to FABEST | Per milestone | Papers published | D-diss |
| 43 | Online research communities (ResearchGate, iMechanica, LinkedIn) | Online channels amplify reach and recruit informally at near-zero cost. | Social posts; community threads | Continuous | Reach & engagement metrics | D-diss |
| 44 | GSS / Kos Science Forum platform | GSS platforms host FABER sessions and amplify science-to-policy translation. | Airmeet; From Mapping to Impact | Per milestone | Sessions hosted & amplified | D-diss |
| 45 | Related COST Actions & Horizon Europe projects | Adjacent networks are cross-fertilisation and successor-consortium partners. | Joint sessions; consortium scoping | Per milestone | Joint activity / PASP partner | D-PASP |
| 46 | Early-Career Investigators (PhDs, postdocs) | ECIs are FABER's Data Officers and FatPy contributors, and its future. | Training Schools; STSMs | Per milestone | ECIs trained & contributing | D-cap |
| 47 | Digital-twin / Industry 4.0 vendors | Validated FABER modules can sit inside digital-twin and Industry 4.0 platforms. | Vendor liaison; integration pilots | Per milestone | Integration interest | D-FatPy |
| 48 | Standards test-data providers (specimen manufacturers) | Specimen providers gain visibility and influence by supplying FABEST campaigns. | WG3 procurement; recognition | Per round | Specimens supplied | D3 |
| 49 | Educators / curriculum bodies | FABER materials feed teaching and a pipeline of validation-literate engineers. | Curriculum links; CPD | Annual | Teaching uptake | D-cap |
| 50 | Insurance bodies / underwriters | Benchmark evidence supports risk pricing and due-diligence for insured assets. | Underwriter liaison | Annual | Benchmarking recognised in risk practice | D-std |
Risk Linkage
| RISK ↔ STAKEHOLDER LINKAGE | ||||||||
| MoU §4.1.3 risks mapped to stakeholders. Score = Likelihood × Impact (1-5). | ||||||||
| # | MoU risk | Affected stakeholders | Likelihood | Impact | Score | Rating | Mitigation | Owner |
| 1 | Limited interest from industry | End users; SMEs; resellers; national societies | 4 | 4 | 16 | High | Engineering bodies (ESIS/DVM/SF2M); FABEST; Training Schools; website & social media | Sci Comm / Stakeholders TF |
| 2 | Limited interest from solver developers | Dassault; Ansys; Siemens/Hexagon/MSC; resellers | 4 | 3 | 12 | Medium | Dedicated developer meeting early; reseller channel; open-source FatPy as common base | Chair / WG3 |
| 3 | Lack of experimental machines / facilities | Experimental labs; specimen providers | 3 | 4 | 12 | Medium | Two-competition plan; reward facilities with result-presentation rights; WG3 support | WG3 Leader |
| 4 | Disagreement on publishing benchmark results | Solver developers; large in-house groups | 3 | 3 | 9 | Medium | Provide benchmark inputs to institutions; transparency; bad-advertisement deterrent | Chair / WG3 |
| 5 | Only poor-quality data for an effect | Academia; experimental labs | 3 | 2 | 6 | Low | Strict acceptance criteria (WG1); report rejections; broaden data search | WG1 / WG4 |
| 6 | Excessive complexity of test records | Academia; data & open science; standards bodies | 3 | 3 | 9 | Medium | Reasonable WG1 record standard; Data Committee; phased complexity (WG5 later) | WG1 Leader |
| 7 | Standards uptake stalls | ISO/CEN/ASTM; certification bodies; policymakers | 3 | 4 | 12 | Medium | Early TC engagement; CEN Workshop Agreement; pre-normative input package | VC / Chair |
| 8 | Sustainability gap after grant end | Policymakers; EOSC; industry consortium; related projects | 3 | 4 | 12 | Medium | PASP scoping toward European Fatigue Observatory & Innovation Centre; Horizon follow-on | Chair / Stakeholders TF |
PASP Map
| POST-ACTION SUSTAINABILITY PLAN (PASP) MAP | |||||
| From 'MoU to Legacy' — which stakeholders carry FABER beyond the grant. | |||||
| Sustainability pillar | Description | Anchor stakeholder(s) | Vehicle / mechanism | Time horizon | Status / note |
| Data repository custodianship | Maintain the curated experimental data & benchmark sets beyond the grant | Academia; EOSC; JRC/ODIN; industry consortium | FAIR hosting agreement; DOI minting; consortium fee | M36-M48+ | Define custodian early |
| Open-source tool stewardship | Continued development & releases of FatPy | WG6; OSS community; solver developers | GitHub governance; maintainer model; FatPy-as-a-Service | M24-M48+ | Set governance & release policy |
| Benchmarking as a service | Neutral conformity & validation against the Repository | Industry end users; certification bodies; SMEs | FABER Validation Mark; conformity service | M42-M48+ | Underwriters-Laboratories logic for fatigue |
| FABEST as a recurring instrument | Self-financing biennial competition | Experimental labs; solver developers; industrial sponsors | Sponsored biennial competition; advisory board | M30-M48+ | Citable evidence point per method |
| Standardisation authority | Turn outputs into normative references | ISO/CEN/ASTM; NAFEMS; FKM; policymakers | CEN Workshop Agreement toward EN/ISO | M30-M48+ | FABER members as technical authority |
| Industry consortium | Recurring membership funding the ecosystem | End users; solver developers; certifiers | Tiered consortium; confidential round-robins | M36-M48+ | NAFEMS model adapted to fatigue |
| Data-space anchoring | FABER as the fatigue-data node in EU data spaces | DG CNECT; Catena-X/Factory-X/Aerospace-X | Manufacturing-X connector under Gaia-X | M36-M48+ | Funding beyond COST/Horizon |
| Capacity & succession | Next-generation contributors & a successor project | ECIs; related COST/Horizon projects; educators | MSCA Doctoral Network; successor consortium | M24-M48+ | Extends MoU YRI & WG5-successor commitments |
| Vision: European Fatigue Observatory & Innovation Centre | Standing post-Action body: monitor + validate + testbeds | All anchors above | SPV combining observatory & innovation-centre functions | Post-Action | The neutral European reference no commercial actor can be |
Key Individuals
| KEY INDIVIDUALS TO ENGAGE | |||||
| # | Profile / role | Where they sit | Why they matter to FABER | Linked WG(s) | First move |
| 1 | Chief Technology Officers of fatigue-software vendors | Ansys, Dassault SIMULIA, Hexagon/MSC, nCode, Altair | Hold the decision on whether commercial solvers engage with open benchmarking. | WG3·WG6 | Invite to the dedicated solver-developer meeting |
| 2 | Heads of durability engineering | Airbus, automotive OEMs, energy & offshore companies | Own the real validation cases and the adoption decision inside industry. | WG4·WG5 | Offer early FABEST access and a benchmark case exchange |
| 3 | Chairs of ASTM / ISO fatigue technical committees | ASTM E08; ISO TCs (12107, 12108) | Gatekeepers for turning FABER outputs into normative reporting. | WG2·WG4 | Align reporting conventions; propose pre-normative input |
| 4 | Leaders of major fatigue laboratories | Fraunhofer LBF/IWM; leading university labs | Control data contribution and FABEST testing capacity. | WG3·WG4 | Secure data and a FABEST campaign commitment |
| 5 | Research data management & FAIR-data experts | EOSC; national RDM bodies | Make the Repository genuinely FAIR, federated and citable. | WG1·WG6 | Co-design the WG1 record format and DOI workflow |
| 6 | Open-source scientific software leaders | FatPy maintainers; RSE community | Sustain FatPy as a governed, validated reference base. | WG6 | Set GitHub governance and a release/versioning policy |
| 7 | European Commission officers (competitiveness, digital engineering, research infrastructures) | DG GROW, DG CNECT, DG RTD | Open policy uptake, data-space anchoring and follow-on funding. | All | Brief on FABER as industrial-data-space candidate |
| 8 | Editors of leading fatigue journals | Int. J. Fatigue; FFEMS | Carry the survey, benchmark and competition papers. | WG2·WG4·WG5 | Propose a special issue tied to FABEST rounds |
| 9 | Coordinators of related COST Actions & Horizon projects | EMMC; data-space & materials projects | Cross-fertilisation and successor-consortium partners for the PASP. | All | Scope joint activities and a successor consortium |
Top 10 Targets
| TOP 10 TARGETS FOR MAXIMUM IMPACT | ||||
| Rank | Target | Category | Why decisive | Linked WG(s) |
| 1 | Ansys | Solver developer | Largest commercial fatigue/FE vendor; its engagement signals the field. | WG3·WG6 |
| 2 | Dassault Systèmes SIMULIA (fe-safe) | Solver developer | Named in the MoU; benchmark participation is a credibility lever. | WG3·WG6 |
| 3 | Hexagon / MSC Software | Solver developer | Major durability-software vendor central to industrial uptake. | WG3·WG6 |
| 4 | Airbus | Industry — aerospace | Life-limiting LCF problems; adoption signals the whole sector. | WG4·WG5 |
| 5 | Rolls-Royce | Industry — aerospace | Engine LCF is the highest-stakes validation case. | WG4·WG5 |
| 6 | ASTM fatigue committees | Standards | Owners of the statistical/testing standards FABER aligns with. | WG2·WG4 |
| 7 | ISO fatigue technical committees | Standards | Route to international normative status. | WG1·WG2·WG4 |
| 8 | EOSC | Data & open science | FAIR hosting, DOIs and federated query for the Repository. | WG1·WG6 |
| 9 | ESIS (European Structural Integrity Society) | Networks | Primary European dissemination and standards-alignment channel. | WG2·WG3·WG4 |
| 10 | European Commission (research & industrial policy units) | Policy & regulatory | Policy uptake, data-space anchoring and follow-on funding. | All |
Combined Priority
| COMBINED PRIORITY — OVERALL SCORE & AUTO-TIERING | |||||||||||
| WEIGHTS (edit these) | Salience | Power-Interest | Influence-Impact | D-Critical | Engagement gap | ||||||
| value → | 35 | 20 | 20 | 15 | 10 | ||||||
| TIER THRESHOLDS | Tier 1 ≥ | 65 | Tier 2 ≥ | 45 | Borderline band ± | 2 | |||||
| ID | Stakeholder | Category | Salience (norm) | Power-Int (norm) | Infl-Impact (norm) | D-Critical (0/100) | Eng. gap (norm) | OVERALL SCORE | Tier | Sensitivity | Effort–Value |
| 1 | European Commission — DG GROW (industrial competitiveness) | Policy & regulatory | 75 | 75 | 100 | 100 | 50 | 81.24992 | Tier 1 | Major project | |
| 2 | European Commission — DG RTD (research & innovation) | Policy & regulatory | 75 | 75 | 100 | 100 | 50 | 81.24991 | Tier 1 | Major project | |
| 3 | European Commission — DG CNECT (digital/data spaces) | Policy & regulatory | 67 | 63 | 88 | 100 | 75 | 76.1499 | Tier 1 | Major project | |
| 4 | European Parliament committees (ITRE; ENVI; IMCO) | Policy & regulatory | 58 | 50 | 75 | 100 | 50 | 65.29988999999999 | Tier 1 | Borderline | Major project |
| 5 | National ministries (industry, research, transport) | Policy & regulatory | 50 | 63 | 75 | 100 | 50 | 65.09988 | Tier 1 | Borderline | Major project |
| 6 | EASA (aviation safety) | Policy & regulatory | 50 | 63 | 75 | 100 | 50 | 65.09987 | Tier 1 | Borderline | Major project |
| 7 | EU Agency for Railways (ERA) | Policy & regulatory | 50 | 63 | 75 | 100 | 50 | 65.09985999999999 | Tier 1 | Borderline | Major project |
| 8 | EMSA (maritime safety) | Policy & regulatory | 42 | 50 | 63 | 0 | 25 | 39.79985 | Tier 3 | Fill-in | |
| 9 | Joint Research Centre (JRC) | Policy & regulatory | 58 | 50 | 75 | 100 | 50 | 65.29984 | Tier 1 | Borderline | Major project |
| 55 | National safety & infrastructure regulators | Policy & regulatory | 50 | 63 | 75 | 100 | 25 | 62.599830000000004 | Tier 2 | Quick win | |
| 56 | Defence & dual-use procurement agencies | Policy & regulatory | 50 | 50 | 75 | 100 | 25 | 59.99982 | Tier 2 | Quick win | |
| 10 | European fatigue research groups (Fraunhofer LBF/IWM, PoliMi, TU Delft, NTUA) | Academia | 75 | 75 | 88 | 100 | 50 | 78.84980999999999 | Tier 1 | Major project | |
| 11 | Experimental fatigue laboratories | Academia | 67 | 63 | 75 | 100 | 75 | 73.54979999999999 | Tier 1 | Major project | |
| 12 | Materials-modelling & ML researchers | Academia | 50 | 50 | 75 | 0 | 50 | 47.49979 | Tier 2 | Major project | |
| 13 | Czech Academy of Sciences & national laboratories | Academia | 58 | 63 | 75 | 100 | 50 | 67.89978 | Tier 1 | Major project | |
| 14 | Aerospace OEMs & engine makers (Airbus, Rolls-Royce, Safran) | Industry — end user | 58 | 63 | 75 | 100 | 50 | 67.89977 | Tier 1 | Major project | |
| 15 | Energy & offshore operators (Siemens Energy, wind/offshore) | Industry — end user | 58 | 63 | 75 | 100 | 50 | 67.89976 | Tier 1 | Major project | |
| 16 | Automotive & rail OEMs (Volvo, Stellantis, Alstom) | Industry — end user | 50 | 63 | 75 | 100 | 50 | 65.09975 | Tier 1 | Borderline | Major project |
| 17 | Additive manufacturing firms | Industry — end user | 50 | 50 | 63 | 100 | 50 | 60.099740000000004 | Tier 2 | Major project | |
| 18 | Steel / welded-structure fabricators | Industry — end user | 42 | 50 | 63 | 0 | 50 | 42.29973 | Tier 3 | Deprioritise | |
| 19 | SMEs performing fatigue analysis | Industry — end user | 42 | 50 | 50 | 0 | 50 | 39.699720000000006 | Tier 3 | Deprioritise | |
| 20 | Large in-house fatigue groups | Industry — end user | 50 | 63 | 75 | 100 | 25 | 62.59971 | Tier 2 | Quick win | |
| 21 | Safety-critical infrastructure operators | Industry — end user | 58 | 63 | 75 | 100 | 50 | 67.89970000000001 | Tier 1 | Major project | |
| 51 | Shipbuilding & marine structures | Industry — end user | 42 | 50 | 63 | 0 | 50 | 42.29969 | Tier 3 | Deprioritise | |
| 52 | Heavy machinery & off-highway | Industry — end user | 42 | 50 | 63 | 0 | 50 | 42.299679999999995 | Tier 3 | Deprioritise | |
| 53 | Civil infrastructure owners & engineers | Industry — end user | 42 | 50 | 63 | 0 | 50 | 42.29967 | Tier 3 | Deprioritise | |
| 22 | Dassault Systèmes (SIMULIA / fe-safe) | Solver developer | 50 | 50 | 75 | 100 | 50 | 62.49966 | Tier 2 | Major project | |
| 23 | Ansys (nCode DesignLife) | Solver developer | 50 | 50 | 75 | 100 | 50 | 62.49965 | Tier 2 | Major project | |
| 24 | Siemens / Hexagon / MSC | Solver developer | 50 | 50 | 75 | 100 | 50 | 62.49964 | Tier 2 | Major project | |
| 25 | Open-source fatigue tool community (FatPy) | Solver developer | 50 | 50 | 75 | 0 | 75 | 49.99963 | Tier 2 | Major project | |
| 26 | ISO fatigue technical committees | Standards & certification | 75 | 63 | 88 | 100 | 50 | 76.44962 | Tier 1 | Major project | |
| 27 | CEN / Eurocode committees (EN 1993-1-9) | Standards & certification | 75 | 63 | 88 | 100 | 50 | 76.44961 | Tier 1 | Major project | |
| 28 | ASTM International (fatigue committees) | Standards & certification | 67 | 50 | 75 | 100 | 50 | 68.4496 | Tier 1 | Major project | |
| 29 | NAFEMS | Standards & certification | 67 | 63 | 75 | 100 | 50 | 71.04959 | Tier 1 | Major project | |
| 30 | FKM (FKM Guideline) | Standards & certification | 67 | 50 | 75 | 100 | 50 | 68.44958 | Tier 1 | Major project | |
| 31 | Certification bodies (DNV, Lloyd's Register, Bureau Veritas, TÜV) | Standards & certification | 50 | 50 | 75 | 100 | 50 | 62.49957 | Tier 2 | Major project | |
| 32 | EOSC / FAIR data infrastructure | Data & open science | 58 | 50 | 75 | 100 | 75 | 67.79956 | Tier 1 | Major project | |
| 33 | OpenAIRE | Data & open science | 50 | 50 | 63 | 0 | 50 | 45.09955 | Tier 2 | Borderline | Major project |
| 34 | Common European Data Space for Manufacturing (Catena-X, Factory-X, Aerospace-X) | Data & open science | 58 | 50 | 75 | 100 | 75 | 67.79954 | Tier 1 | Major project | |
| 35 | FAIR-data experts & research software engineering communities | Data & open science | 50 | 50 | 75 | 0 | 50 | 47.49953 | Tier 2 | Major project | |
| 36 | EMMC (Eur. Materials Modelling Council) | Data & open science | 50 | 50 | 63 | 0 | 50 | 45.09952 | Tier 2 | Borderline | Major project |
| 54 | National research data repositories | Data & open science | 50 | 50 | 63 | 0 | 50 | 45.09951 | Tier 2 | Borderline | Major project |
| 37 | ESIS (European Structural Integrity Society) | Networks & dissemination | 67 | 63 | 63 | 100 | 75 | 71.1495 | Tier 1 | Major project | |
| 38 | IIW (International Institute of Welding) | Networks & dissemination | 67 | 50 | 63 | 100 | 50 | 66.04948999999999 | Tier 1 | Borderline | Major project |
| 39 | European Federation of Corrosion (EFC) | Networks & dissemination | 50 | 50 | 50 | 0 | 50 | 42.49948 | Tier 3 | Deprioritise | |
| 40 | National engineering societies (DVM, SF2M, Gruppo Frattura, CSM, SPFIE) | Networks & dissemination | 50 | 50 | 50 | 0 | 50 | 42.49947 | Tier 3 | Deprioritise | |
| 41 | Fatigue conferences (ICF, Fatigue Design, ICEFA, ICMFF) | Networks & dissemination | 58 | 50 | 63 | 100 | 50 | 62.89946 | Tier 2 | Major project | |
| 42 | Leading fatigue journals (Int. J. Fatigue; FFEMS) | Networks & dissemination | 58 | 50 | 63 | 100 | 50 | 62.89945 | Tier 2 | Major project | |
| 43 | Online research communities (ResearchGate, iMechanica, LinkedIn) | Networks & dissemination | 42 | 50 | 38 | 0 | 25 | 34.79944 | Tier 3 | Fill-in | |
| 44 | GSS / Kos Science Forum platform | Networks & dissemination | 58 | 63 | 63 | 100 | 50 | 65.49943 | Tier 1 | Borderline | Major project |
| 45 | Related COST Actions & Horizon Europe projects | Capacity & cross-cutting | 50 | 50 | 50 | 0 | 50 | 42.49942 | Tier 3 | Deprioritise | |
| 46 | Early-Career Investigators (PhDs, postdocs) | Capacity & cross-cutting | 50 | 50 | 63 | 0 | 75 | 47.59941 | Tier 2 | Major project | |
| 47 | Digital-twin / Industry 4.0 vendors | Capacity & cross-cutting | 42 | 50 | 50 | 0 | 50 | 39.699400000000004 | Tier 3 | Deprioritise | |
| 48 | Standards test-data providers (specimen manufacturers) | Capacity & cross-cutting | 42 | 38 | 38 | 0 | 50 | 34.89939 | Tier 3 | Deprioritise | |
| 49 | Educators / curriculum bodies | Capacity & cross-cutting | 33 | 38 | 38 | 0 | 25 | 29.24938 | Tier 3 | Fill-in | |
| 50 | Insurance bodies / underwriters | Capacity & cross-cutting | 42 | 38 | 50 | 0 | 25 | 34.799369999999996 | Tier 3 | Fill-in | |
| LIVE TOP 10 BY OVERALL SCORE (re-sorts automatically) | |||||||||||
| Rank | Stakeholder | Score | Tier | ||||||||
| 1 | European Commission — DG GROW (industrial competitiveness) | 81 | Tier 1 | ||||||||
| 2 | European Commission — DG RTD (research & innovation) | 81 | Tier 1 | ||||||||
| 3 | European fatigue research groups (Fraunhofer LBF/IWM, PoliMi, TU Delft, NTUA) | 79 | Tier 1 | ||||||||
| 4 | ISO fatigue technical committees | 76 | Tier 1 | ||||||||
| 5 | CEN / Eurocode committees (EN 1993-1-9) | 76 | Tier 1 | ||||||||
| 6 | European Commission — DG CNECT (digital/data spaces) | 76 | Tier 1 | ||||||||
| 7 | Experimental fatigue laboratories | 74 | Tier 1 | ||||||||
| 8 | ESIS (European Structural Integrity Society) | 71 | Tier 1 | ||||||||
| 9 | NAFEMS | 71 | Tier 1 | ||||||||
| 10 | ASTM International (fatigue committees) | 68 | Tier 1 |
Radar
| RADAR — TOP 10 TARGETS ACROSS FIVE LENSES | ||||||||||
| Power · Legitimacy · Urgency · Interest · Impact (1-5). Pulls live scores; edit inputs and the radar updates. | ||||||||||
| Lens | Ansys | Dassault SIMULIA | Hexagon / MSC | Aerospace OEMs | Energy & offshore | ASTM | ISO | EOSC | ESIS | EC DG GROW |
| Power | 4 | 4 | 4 | 4 | 4 | 4 | 5 | 3 | 4 | 5 |
| Legitimacy | 3 | 3 | 3 | 3 | 3 | 5 | 5 | 4 | 5 | 4 |
| Urgency | 2 | 2 | 2 | 3 | 3 | 2 | 2 | 3 | 2 | 3 |
| Interest | 2 | 2 | 2 | 3 | 3 | 2 | 2 | 3 | 3 | 3 |
| Impact | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 5 | 3 | 5 |
Dashboard
| FABER STAKEHOLDER DASHBOARD | ||||
| Live counts from the Salience and Power-Interest tabs. Edit scores there to update. | ||||
| By salience class | By Power-Interest quadrant | |||
| Definitive | 15 | Manage Closely | 35 | |
| Dominant | 33 | Keep Satisfied | 13 | |
| Dangerous | 0 | Keep Informed | 8 | |
| Dependent | 7 | Monitor | 0 | |
| Dormant | 0 | |||
| Discretionary | 1 | |||
| Demanding | 0 | |||
| Latent | 0 | |||
| TOTAL | 56 | |||
| By category | ||||
| Policy & regulatory | 11 | |||
| Academia | 4 | |||
| Industry — end user | 11 | |||
| Solver developer | 4 | |||
| Standards & certification | 6 | |||
| Data & open science | 6 | |||
| Networks & dissemination | 8 | |||
| Capacity & cross-cutting | 6 |
Stakeholder Groups Analysis
| Group # | Stakeholder Group | Type | FABER WG / MoU Relevance | Influence (0–100) | D-Critical | WG Relevance | Priority Flag | Entity / Organisation | Description | Key Tags | Interest Level | Notes / Engagement Detail |
| 1 | Government & policy actors | Policy & regulatory | WG4·WG5 | MoU | 80 | Yes | WG4·WG5 | Yes | European Commission — DG GROW (industrial competitiveness) | Industrial competitiveness; advanced manufacturing. Policy uptake; competitiveness evidence; PASP & funding alignment | policy & regulatory | Medium | Validated fatigue prediction strengthens EU industrial competitiveness and safe, efficient design. |
| 1 | Government & policy actors | Policy & regulatory | All | MoU | 80 | Yes | All | Yes | European Commission — DG RTD (research & innovation) | Follow-on funding; research-infrastructure alignment. Sustainability funding; Horizon alignment for PASP | policy & regulatory | Medium | FABER is a candidate research-infrastructure and Horizon follow-on with clear industrial impact. |
| 1 | Government & policy actors | Policy & regulatory | WG1·WG6 | MoU | 73 | Yes | WG1·WG6 | Yes | European Commission — DG CNECT (digital/data spaces) | FAIR, sovereign, federated data spaces. Position FABER as the fatigue-data node in the Manufacturing Data Space | policy & regulatory | Medium | FABER's WG1 record format is ready to feed a Manufacturing-X connector under Gaia-X. |
| 1 | Government & policy actors | Policy & regulatory | WG4·WG5 | MoU | 67 | Yes | WG4·WG5 | Yes | European Parliament committees (ITRE; ENVI; IMCO) | Safety, competitiveness, sustainable industry. Political visibility; legitimacy for benchmarking | policy & regulatory | Low | Open fatigue benchmarking serves safety, competitiveness and the green/industrial agenda. |
| 1 | Government & policy actors | Policy & regulatory | WG1·WG4 | MoU | 60 | Yes | WG1·WG4 | Yes | National ministries (industry, research, transport) | National co-funding; uptake; implementation. National backing; co-funding for interface/tool work | policy & regulatory | Medium | National competitiveness and safety benefit from validated, shared fatigue benchmarks. |
| 1 | Government & policy actors | Policy & regulatory | WG4·WG5 | MoU | 60 | Yes | WG4·WG5 | Yes | EASA (aviation safety) | Downstream beneficiary; safety assurance. Regulatory relevance; validation evidence in aviation | policy & regulatory | Medium | Validated LCF prediction supports airworthiness and life-limiting-part assurance. |
| 1 | Government & policy actors | Policy & regulatory | WG4·WG5 | MoU | 60 | Yes | WG4·WG5 | Yes | EU Agency for Railways (ERA) | Downstream beneficiary; interoperability & safety. Regulatory relevance in rail | policy & regulatory | Medium | Validated fatigue codes support rail safety and interoperability. |
| 1 | Government & policy actors | Policy & regulatory | WG4·WG5 | MoU | 53 | No | WG4·WG5 | No | EMSA (maritime safety) | Downstream beneficiary; structural integrity. Regulatory relevance in maritime/offshore | policy & regulatory | Medium | Validated fatigue prediction supports maritime structural-integrity assurance. |
| 1 | Government & policy actors | Policy & regulatory | WG1 | MoU | 67 | Yes | WG1 | Yes | Joint Research Centre (JRC) | Policy-relevant data infrastructure. Hosting/credibility option; data-aggregation reuse | policy & regulatory | Low | JRC's SSbD and data infrastructure align with FABER's repository and standards aims. |
| 1 | Government & policy actors | Policy & regulatory | WG4·WG5 | MoU | 60 | Yes | WG4·WG5 | Yes | National safety & infrastructure regulators | Implementation-level safety assurance. Implementation realism; national legitimacy | policy & regulatory | Medium | National regulators connect FABER evidence to implementation realities across Member States. |
| 1 | Government & policy actors | Policy & regulatory | WG4·WG5 | MoU | 60 | Yes | WG4·WG5 | Yes | Defence & dual-use procurement agencies | Structural integrity of defence assets. Dual-use validation; procurement legitimacy | policy & regulatory | Low | Defence assets depend on fatigue-critical structures; validated prediction supports procurement assurance. |
| 2 | Academia (MoU community) | Academia | WG2·WG4·WG5 | MoU | 80 | Yes | WG2·WG4·WG5 | Yes | European fatigue research groups (Fraunhofer LBF/IWM, PoliMi, TU Delft, NTUA) | Free access to curated data sets. Data contribution; benchmark validation; method expertise | academia | High | FABER gives you curated, citable benchmark data and a route to validated methods. |
| 2 | Academia (MoU community) | Academia | WG3·WG4 | MoU | 73 | Yes | WG3·WG4 | Yes | Experimental fatigue laboratories | Recognition; shared workload. Run competition experiments; raw data; specimens | academia | High | FABER shares the testing burden and gives your lab recognition and influence on results. |
| 2 | Academia (MoU community) | Academia | WG2.3 | MoU | 60 | No | WG2.3 | Yes | Materials-modelling & ML researchers | ML on large fatigue data sets. Validate AI/ML enhancement of data sets | academia | High | FABER's large, curated data sets are the precondition for trustworthy ML in fatigue. |
| 2 | Academia (MoU community) | Academia | WG1·WG2 | MoU | 67 | Yes | WG1·WG2 | Yes | Czech Academy of Sciences & national laboratories | Historical data; curation capacity. Historical data; curation; record-format consensus | academia | High | Your historical data and curation capacity help build a credible benchmark base. |
| 3 | Industry — end users (MoU community) | Industry — end user | WG4·WG5 | MoU | 67 | Yes | WG4·WG5 | Yes | Aerospace OEMs & engine makers (Airbus, Rolls-Royce, Safran) | Safety-critical fatigue confidence. Domain problems; validation cases; early adoption | industry — end user | Medium | Early access to validated benchmarks de-risks life-limiting fatigue decisions. |
| 3 | Industry — end users (MoU community) | Industry — end user | WG4·WG5 | MoU | 67 | Yes | WG4·WG5 | Yes | Energy & offshore operators (Siemens Energy, wind/offshore) | Reliable long-life fatigue assessment. Sector use cases; sustainability backing | industry — end user | Medium | Validated methods underpin 20-25 year design lives on ever-larger structures. |
| 3 | Industry — end users (MoU community) | Industry — end user | WG4·WG5 | MoU | 60 | Yes | WG4·WG5 | Yes | Automotive & rail OEMs (Volvo, Stellantis, Alstom) | Reliable, lower-cost fatigue assessment. Use cases; sustainability backing; adoption | industry — end user | Medium | Shared benchmarks lower the cost and raise the confidence of durability sign-off. |
| 3 | Industry — end users (MoU community) | Industry — end user | WG5.1 | MoU | 60 | Yes | WG5.1 | No | Additive manufacturing firms | Fatigue of AM/porous structures. Emerging-defect use cases (WG5.1) | industry — end user | Medium | FABER targets the AM fatigue behaviours classical S-N data do not yet cover. |
| 3 | Industry — end users (MoU community) | Industry — end user | WG5.3 | MoU | 53 | No | WG5.3 | No | Steel / welded-structure fabricators | Welded-joint fatigue (HAZ). Welded-joint use cases & data (WG5.3) | industry — end user | Medium | Welded-joint benchmarks address the residual-stress and HAZ behaviours you face. |
| 3 | Industry — end users (MoU community) | Industry — end user | WG3·WG4 | MoU | 53 | No | WG3·WG4 | No | SMEs performing fatigue analysis | Affordable, trustworthy validation. Demand signal; adoption | industry — end user | High | FABER gives SMEs the neutral validation they cannot afford to build alone. |
| 3 | Industry — end users (MoU community) | Industry — end user | WG2·WG4 | MoU | 60 | Yes | WG2·WG4 | Yes | Large in-house fatigue groups | Cross-validation; talent pipeline. Tacit endorsement; YRI hiring | industry — end user | Medium | FABER offers neutral cross-validation against your private benchmarks. |
| 3 | Industry — end users (MoU community) | Industry — end user | WG5 | MoU | 67 | Yes | WG5 | Yes | Safety-critical infrastructure operators | Asset integrity & life extension. Real-world problem definitions | industry — end user | Medium | Validated fatigue prediction underpins asset-integrity and life-extension decisions. |
| 3 | Industry — end users (MoU community) | Industry — end user | WG5 | MoU | 53 | No | WG5 | No | Shipbuilding & marine structures | Hull & welded-joint fatigue over long service lives. Marine welded-joint use cases & data | industry — end user | Medium | Shipbuilding fatigue, dominated by welded joints and variable seas, is squarely in WG5 territory. |
| 3 | Industry — end users (MoU community) | Industry — end user | WG4·WG5 | MoU | 53 | No | WG4·WG5 | No | Heavy machinery & off-highway | Durability under variable-amplitude duty cycles. Variable-amplitude & multiaxial use cases | industry — end user | Medium | Off-highway duty cycles are exactly the variable-amplitude, multiaxial cases benchmarks lack. |
| 3 | Industry — end users (MoU community) | Industry — end user | WG4·WG5 | MoU | 53 | No | WG4·WG5 | No | Civil infrastructure owners & engineers | Eurocode-anchored fatigue assessment. Civil use cases tied to EN 1993-1-9 | industry — end user | Medium | Civil fatigue assessment runs on Eurocode 3; FABER benchmarks can calibrate it. |
| 4 | Industry — solver developers (MoU community) | Solver developer | WG3·WG4·WG6 | MoU | 60 | Yes | WG3·WG4·WG6 | Yes | Dassault Systèmes (SIMULIA / fe-safe) | Customer assurance; reputation. Engagement; benchmark participation | solver developer | Low | FABEST is a credibility opportunity: prove your solver against neutral benchmarks. |
| 4 | Industry — solver developers (MoU community) | Solver developer | WG3·WG4·WG6 | MoU | 60 | Yes | WG3·WG4·WG6 | Yes | Ansys (nCode DesignLife) | Customer assurance; reputation. Engagement; participation | solver developer | Low | Anonymised benchmarking lets you demonstrate quality without exposing IP. |
| 4 | Industry — solver developers (MoU community) | Solver developer | WG3·WG4·WG6 | MoU | 60 | Yes | WG3·WG4·WG6 | Yes | Siemens / Hexagon / MSC | Customer assurance; reputation. Engagement; participation | solver developer | Low | Open benchmarking and FatPy as a shared base strengthen the whole field. |
| 4 | Industry — solver developers (MoU community) | Solver developer | WG6 | MoU | 60 | No | WG6 | Yes | Open-source fatigue tool community (FatPy) | Shared, maintained code base. Co-develop the open-source library (WG6) | solver developer | High | FatPy is the shared, validated reference base the community has lacked. |
| 5 | Standards & certification | Standards & certification | WG1·WG2·WG4 | MoU | 80 | Yes | WG1·WG2·WG4 | Yes | ISO fatigue technical committees | Normative uptake. Pre-normative input; record-format & methods | standards & certification | Low | FABER outputs are pre-normative input ISO committees can consolidate. |
| 5 | Standards & certification | Standards & certification | WG2·WG3·WG4 | MoU | 80 | Yes | WG2·WG3·WG4 | Yes | CEN / Eurocode committees (EN 1993-1-9) | Code calibration evidence. Long-term standardisation pathway | standards & certification | Low | A CEN Workshop Agreement seeded by FABER opens the route to an EN standard. |
| 5 | Standards & certification | Standards & certification | WG2·WG4 | MoU | 73 | Yes | WG2·WG4 | Yes | ASTM International (fatigue committees) | Reporting & method alignment. Reporting-convention alignment | standards & certification | Low | Aligning FABER reporting with ASTM standards lifts comparability and uptake. |
| 5 | Standards & certification | Standards & certification | WG1·WG4 | MoU | 73 | Yes | WG1·WG4 | Yes | NAFEMS | V&V standards. Joint workshop; credibility | standards & certification | Medium | FABER is the fatigue analogue of the V&V role NAFEMS pioneered for FE. |
| 5 | Standards & certification | Standards & certification | WG2·WG4 | MoU | 73 | Yes | WG2·WG4 | Yes | FKM (FKM Guideline) | Guideline calibration. Acceptance-criteria alignment | standards & certification | Low | FABER benchmarks can calibrate and validate FKM acceptance criteria. |
| 5 | Standards & certification | Standards & certification | WG3·WG4·WG5 | MoU | 60 | Yes | WG3·WG4·WG5 | Yes | Certification bodies (DNV, Lloyd's Register, Bureau Veritas, TÜV) | Liability & risk reduction. Endorse benchmarking as due diligence | standards & certification | Low | Benchmark evidence supports qualification and reduces liability, especially offshore. |
| 6 | Data & open science | Data & open science | WG1·WG6 | MoU | 67 | Yes | WG1·WG6 | No | EOSC / FAIR data infrastructure | Open, findable research data. FAIR-compliant hosting; DOIs/PIDs | data & open science | Medium | EOSC provides the FAIR hosting and DOI minting the Repository needs. |
| 6 | Data & open science | Data & open science | WG1·WG6 | MoU | 60 | No | WG1·WG6 | No | OpenAIRE | Open-access aggregation. Citable releases; metadata harvesting | data & open science | Medium | OpenAIRE makes FABER outputs discoverable and citable across Europe. |
| 6 | Data & open science | Data & open science | WG1·WG6 | MoU | 67 | Yes | WG1·WG6 | No | Common European Data Space for Manufacturing (Catena-X, Factory-X, Aerospace-X) | FAIR sovereign federated data. FABER as the fatigue-data node | data & open science | Medium | FABER's record format is ready to feed a Manufacturing-X connector tomorrow. |
| 6 | Data & open science | Data & open science | WG1·WG6 | MoU | 60 | No | WG1·WG6 | No | FAIR-data experts & research software engineering communities | Operationalise FAIR & OSS governance. FAIRification; FatPy governance | data & open science | High | RSE and FAIR practitioners turn principles into a working, governed repository. |
| 6 | Data & open science | Data & open science | WG1 | MoU | 60 | No | WG1 | No | EMMC (Eur. Materials Modelling Council) | Complementarity; recruitment. Avoid overlap; recruit participants | data & open science | Medium | EMMC complements FABER and is a recruitment and PASP-partner channel. |
| 6 | Data & open science | Data & open science | WG1·WG6 | MoU | 60 | No | WG1·WG6 | No | National research data repositories | Persistent national hosting & curation. Federated hosting; national data feeds | data & open science | Medium | National repositories provide federated, persistent hosting for FABER data feeds. |
| 7 | Civil society — networks & dissemination | Networks & dissemination | WG2·WG3·WG4 | MoU | 73 | Yes | WG2·WG3·WG4 | Yes | ESIS (European Structural Integrity Society) | Dissemination; standards alignment. Audience; standardisation route | networks & dissemination | Medium | ESIS is the primary European dissemination and standards-alignment channel. |
| 7 | Civil society — networks & dissemination | Networks & dissemination | WG5.3 | MoU | 73 | Yes | WG5.3 | Yes | IIW (International Institute of Welding) | Welded-joint fatigue standards. Standards alignment (WG5.3) | networks & dissemination | Low | IIW is the natural home for welded-joint fatigue benchmark categories. |
| 7 | Civil society — networks & dissemination | Networks & dissemination | WG5 | MoU | 60 | No | WG5 | No | European Federation of Corrosion (EFC) | Environmental-fatigue relevance. Environmental & corrosion-fatigue input (WG5) | networks & dissemination | Medium | EFC connects FABER to environmental and corrosion-fatigue communities. |
| 7 | Civil society — networks & dissemination | Networks & dissemination | All | MoU | 60 | No | All | No | National engineering societies (DVM, SF2M, Gruppo Frattura, CSM, SPFIE) | Member dissemination. National reach; recruitment | networks & dissemination | Medium | National societies are low-effort, high-reach relays to industry and academia. |
| 7 | Civil society — networks & dissemination | Networks & dissemination | All | MoU | 67 | Yes | All | No | Fatigue conferences (ICF, Fatigue Design, ICEFA, ICMFF) | Visibility; recruitment. Dissemination venues; FABEST awards | networks & dissemination | Medium | Conferences give FABEST visibility and recruit new contributors. |
| 7 | Civil society — networks & dissemination | Networks & dissemination | WG2·WG4·WG5 | MoU | 67 | Yes | WG2·WG4·WG5 | No | Leading fatigue journals (Int. J. Fatigue; FFEMS) | High-quality publications. 30+ papers; survey & result papers | networks & dissemination | Medium | Journals carry FABER's survey, benchmark and competition papers. |
| 7 | Civil society — networks & dissemination | Networks & dissemination | All | MoU | 53 | No | All | No | Online research communities (ResearchGate, iMechanica, LinkedIn) | Reach; informal recruitment. Amplification; community uptake | networks & dissemination | High | Online channels amplify reach and recruit informally at near-zero cost. |
| 7 | Civil society — networks & dissemination | Networks & dissemination | All | MoU | 67 | Yes | All | No | GSS / Kos Science Forum platform | Cross-Action visibility. Hosting; science-to-policy amplification | networks & dissemination | High | GSS platforms host FABER sessions and amplify science-to-policy translation. |
| 8 | Capacity & cross-cutting | Capacity & cross-cutting | All | MoU | 60 | No | All | Yes | Related COST Actions & Horizon Europe projects | Cross-fertilisation; PASP partnership. Joint activities; successor consortium | capacity & cross-cutting | Medium | Adjacent networks are cross-fertilisation and successor-consortium partners. |
| 8 | Capacity & cross-cutting | Capacity & cross-cutting | All | MoU | 60 | No | All | Yes | Early-Career Investigators (PhDs, postdocs) | Career growth; STSMs; training. Data Officers; FatPy contributors | capacity & cross-cutting | High | ECIs are FABER's Data Officers and FatPy contributors, and its future. |
| 8 | Capacity & cross-cutting | Capacity & cross-cutting | WG6 | MoU | 53 | No | WG6 | No | Digital-twin / Industry 4.0 vendors | Validated fatigue modules. Integration; downstream demand | capacity & cross-cutting | Medium | Validated FABER modules can sit inside digital-twin and Industry 4.0 platforms. |
| 8 | Capacity & cross-cutting | Capacity & cross-cutting | WG3 | MoU | 53 | No | WG3 | No | Standards test-data providers (specimen manufacturers) | Visibility; influence on results. Specimens & testing material | capacity & cross-cutting | Medium | Specimen providers gain visibility and influence by supplying FABEST campaigns. |
| 8 | Capacity & cross-cutting | Capacity & cross-cutting | WG3·WG6 | MoU | 47 | No | WG3·WG6 | No | Educators / curriculum bodies | Teaching material; trained graduates. Pipeline of skilled analysts | capacity & cross-cutting | Medium | FABER materials feed teaching and a pipeline of validation-literate engineers. |
| 8 | Capacity & cross-cutting | Capacity & cross-cutting | WG3·WG4 | MoU | 53 | No | WG3·WG4 | No | Insurance bodies / underwriters | Liability & risk reduction. Endorse benchmarking as due diligence | capacity & cross-cutting | Low | Benchmark evidence supports risk pricing and due-diligence for insured assets. |
D-Critical Stakeholders
| Stakeholder Group | Type | Entity / Organisation | Why Deliverable-Critical | FABER WG / MoU Relevance | Recommended Action | Timeline |
| Government & policy actors | Policy & regulatory | European Commission — DG GROW (industrial competitiveness) | Policy uptake; competitiveness evidence; PASP & funding alignment | WG4·WG5 | MoU | Policy briefs; Brussels meetings; position paper. Validated fatigue prediction strengthens EU industrial competitiveness and safe, efficient design. | Y1–Y2 |
| Government & policy actors | Policy & regulatory | European Commission — DG RTD (research & innovation) | Sustainability funding; Horizon alignment for PASP | All | MoU | Horizon NCP; concept notes; EOSC links. FABER is a candidate research-infrastructure and Horizon follow-on with clear industrial impact. | Y1–Y2 |
| Government & policy actors | Policy & regulatory | European Commission — DG CNECT (digital/data spaces) | Position FABER as the fatigue-data node in the Manufacturing Data Space | WG1·WG6 | MoU | Data-space governance fora; technical workshops. FABER's WG1 record format is ready to feed a Manufacturing-X connector under Gaia-X. | Y1–Y2 |
| Government & policy actors | Policy & regulatory | European Parliament committees (ITRE; ENVI; IMCO) | Political visibility; legitimacy for benchmarking | WG4·WG5 | MoU | Invitations; briefings; stakeholder meetings. Open fatigue benchmarking serves safety, competitiveness and the green/industrial agenda. | Y1–Y2 |
| Government & policy actors | Policy & regulatory | National ministries (industry, research, transport) | National backing; co-funding for interface/tool work | WG1·WG4 | MoU | Permanent Representations; national delegates. National competitiveness and safety benefit from validated, shared fatigue benchmarks. | Y1–Y2 |
| Government & policy actors | Policy & regulatory | EASA (aviation safety) | Regulatory relevance; validation evidence in aviation | WG4·WG5 | MoU | Sectoral briefings; technical liaison. Validated LCF prediction supports airworthiness and life-limiting-part assurance. | Y1–Y2 |
| Government & policy actors | Policy & regulatory | EU Agency for Railways (ERA) | Regulatory relevance in rail | WG4·WG5 | MoU | Sectoral briefings. Validated fatigue codes support rail safety and interoperability. | Y1–Y2 |
| Government & policy actors | Policy & regulatory | Joint Research Centre (JRC) | Hosting/credibility option; data-aggregation reuse | WG1 | MoU | JRC liaison; joint workshop. JRC's SSbD and data infrastructure align with FABER's repository and standards aims. | Y1–Y2 |
| Government & policy actors | Policy & regulatory | National safety & infrastructure regulators | Implementation realism; national legitimacy | WG4·WG5 | MoU | National authorities; sector channels. National regulators connect FABER evidence to implementation realities across Member States. | Y1–Y2 |
| Government & policy actors | Policy & regulatory | Defence & dual-use procurement agencies | Dual-use validation; procurement legitimacy | WG4·WG5 | MoU | EDA; national procurement liaison. Defence assets depend on fatigue-critical structures; validated prediction supports procurement assurance. | Y1–Y2 |
| Academia (MoU community) | Academia | European fatigue research groups (Fraunhofer LBF/IWM, PoliMi, TU Delft, NTUA) | Data contribution; benchmark validation; method expertise | WG2·WG4·WG5 | MoU | WG meetings; STSMs; Training Schools. FABER gives you curated, citable benchmark data and a route to validated methods. | Y1–Y2 |
| Academia (MoU community) | Academia | Experimental fatigue laboratories | Run competition experiments; raw data; specimens | WG3·WG4 | MoU | WG3 outreach; competition calls. FABER shares the testing burden and gives your lab recognition and influence on results. | Y1–Y2 |
| Academia (MoU community) | Academia | Czech Academy of Sciences & national laboratories | Historical data; curation; record-format consensus | WG1·WG2 | MoU | WG1 workshops; Data Committee. Your historical data and curation capacity help build a credible benchmark base. | Y1–Y2 |
| Industry — end users (MoU community) | Industry — end user | Aerospace OEMs & engine makers (Airbus, Rolls-Royce, Safran) | Domain problems; validation cases; early adoption | WG4·WG5 | MoU | Durability-engineering leads; FABEST. Early access to validated benchmarks de-risks life-limiting fatigue decisions. | Y2–Y4 |
| Industry — end users (MoU community) | Industry — end user | Energy & offshore operators (Siemens Energy, wind/offshore) | Sector use cases; sustainability backing | WG4·WG5 | MoU | Sector forums; co-developed cases. Validated methods underpin 20-25 year design lives on ever-larger structures. | Y2–Y4 |
| Industry — end users (MoU community) | Industry — end user | Automotive & rail OEMs (Volvo, Stellantis, Alstom) | Use cases; sustainability backing; adoption | WG4·WG5 | MoU | National societies; Tier-1 suppliers. Shared benchmarks lower the cost and raise the confidence of durability sign-off. | Y2–Y4 |
| Industry — end users (MoU community) | Industry — end user | Additive manufacturing firms | Emerging-defect use cases (WG5.1) | WG5.1 | MoU | WG5.1 task; AM networks. FABER targets the AM fatigue behaviours classical S-N data do not yet cover. | Y2–Y4 |
| Industry — end users (MoU community) | Industry — end user | Large in-house fatigue groups | Tacit endorsement; YRI hiring | WG2·WG4 | MoU | Direct corporate liaison. FABER offers neutral cross-validation against your private benchmarks. | Y2–Y4 |
| Industry — end users (MoU community) | Industry — end user | Safety-critical infrastructure operators | Real-world problem definitions | WG5 | MoU | Operator forums; case calls. Validated fatigue prediction underpins asset-integrity and life-extension decisions. | Y2–Y4 |
| Industry — solver developers (MoU community) | Solver developer | Dassault Systèmes (SIMULIA / fe-safe) | Engagement; benchmark participation | WG3·WG4·WG6 | MoU | Dedicated developer meeting; resellers. FABEST is a credibility opportunity: prove your solver against neutral benchmarks. | Y1–Y2 |
| Industry — solver developers (MoU community) | Solver developer | Ansys (nCode DesignLife) | Engagement; participation | WG3·WG4·WG6 | MoU | Dedicated developer meeting. Anonymised benchmarking lets you demonstrate quality without exposing IP. | Y1–Y2 |
| Industry — solver developers (MoU community) | Solver developer | Siemens / Hexagon / MSC | Engagement; participation | WG3·WG4·WG6 | MoU | Developer meeting; professional networks. Open benchmarking and FatPy as a shared base strengthen the whole field. | Y1–Y2 |
| Standards & certification | Standards & certification | ISO fatigue technical committees | Pre-normative input; record-format & methods | WG1·WG2·WG4 | MoU | TC liaison; technical contributions. FABER outputs are pre-normative input ISO committees can consolidate. | Y2–Y4 |
| Standards & certification | Standards & certification | CEN / Eurocode committees (EN 1993-1-9) | Long-term standardisation pathway | WG2·WG3·WG4 | MoU | CWA proposal; CEN liaison. A CEN Workshop Agreement seeded by FABER opens the route to an EN standard. | Y2–Y4 |
| Standards & certification | Standards & certification | ASTM International (fatigue committees) | Reporting-convention alignment | WG2·WG4 | MoU | Committee chairs; alignment notes. Aligning FABER reporting with ASTM standards lifts comparability and uptake. | Y2–Y4 |
| Standards & certification | Standards & certification | NAFEMS | Joint workshop; credibility | WG1·WG4 | MoU | Joint workshop; liaison. FABER is the fatigue analogue of the V&V role NAFEMS pioneered for FE. | Y2–Y4 |
| Standards & certification | Standards & certification | FKM (FKM Guideline) | Acceptance-criteria alignment | WG2·WG4 | MoU | Guideline working groups. FABER benchmarks can calibrate and validate FKM acceptance criteria. | Y2–Y4 |
| Standards & certification | Standards & certification | Certification bodies (DNV, Lloyd's Register, Bureau Veritas, TÜV) | Endorse benchmarking as due diligence | WG3·WG4·WG5 | MoU | Certifier liaison; case studies. Benchmark evidence supports qualification and reduces liability, especially offshore. | Y2–Y4 |
| Data & open science | Data & open science | EOSC / FAIR data infrastructure | FAIR-compliant hosting; DOIs/PIDs | WG1·WG6 | MoU | EOSC onboarding; RDM networks. EOSC provides the FAIR hosting and DOI minting the Repository needs. | Y2–Y4 |
| Data & open science | Data & open science | Common European Data Space for Manufacturing (Catena-X, Factory-X, Aerospace-X) | FABER as the fatigue-data node | WG1·WG6 | MoU | Data-space pilots; connector spec. FABER's record format is ready to feed a Manufacturing-X connector tomorrow. | Y2–Y4 |
| Civil society — networks & dissemination | Networks & dissemination | ESIS (European Structural Integrity Society) | Audience; standardisation route | WG2·WG3·WG4 | MoU | Co-organised sessions; FABEST. ESIS is the primary European dissemination and standards-alignment channel. | Y2–Y4 |
| Civil society — networks & dissemination | Networks & dissemination | IIW (International Institute of Welding) | Standards alignment (WG5.3) | WG5.3 | MoU | IIW commissions; joint work. IIW is the natural home for welded-joint fatigue benchmark categories. | Y2–Y4 |
| Civil society — networks & dissemination | Networks & dissemination | Fatigue conferences (ICF, Fatigue Design, ICEFA, ICMFF) | Dissemination venues; FABEST awards | All | MoU | Special sessions; competition awards. Conferences give FABEST visibility and recruit new contributors. | Y2–Y4 |
| Civil society — networks & dissemination | Networks & dissemination | Leading fatigue journals (Int. J. Fatigue; FFEMS) | 30+ papers; survey & result papers | WG2·WG4·WG5 | MoU | Special issues tied to FABEST. Journals carry FABER's survey, benchmark and competition papers. | Y2–Y4 |
| Civil society — networks & dissemination | Networks & dissemination | GSS / Kos Science Forum platform | Hosting; science-to-policy amplification | All | MoU | Airmeet; From Mapping to Impact. GSS platforms host FABER sessions and amplify science-to-policy translation. | Y2–Y4 |
FABER Round Robin
| Round | Focus | Core Question | Who Should Be in the Room | Output | Lead FABER WGs | Suggested Timing |
| 1 | Scoping & bottleneck prioritisation | Which WG4 categories and component classes should the first benchmark sets target, and what does 'good enough' mean? | WG1, WG2, WG4 leads; one solver-developer contact; one industrial end user; one policymaker observer | Agreed prioritisation of benchmark categories; scope of the WG1 data record format | WG1·WG2·WG4 | M1–M6 (KO meeting) |
| 2 | Data record format & curation | What fields, provenance and quality criteria must every record carry to be benchmark-grade? | WG1 researchers; Data Committee; FAIR-data expert (EOSC); data-space contact | WG1.1/1.2: data dictionary, record format, curation rules | WG1 | M6–M12 |
| 3 | Methods & categories — state of the art | Where do nominal methods (S-N, strain-life, energy-life, critical-plane) diverge, and on what data? | WG2 & WG4 researchers; method developers; standards observers | Survey papers on WG4 categories; method-to-parameter mapping | WG2·WG4 | M6–M14 |
| 4 | FatPy reference implementations | Which validated reference implementations should FatPy provide, and how are releases versioned and tested? | WG6 developers; RSE community; FatPy contributors; solver developers | FatPy roadmap & versioned reference implementations | WG6 | M10–M18 |
| 5 | FABEST round 1 — Low-Cycle Fatigue | Which methods enter the blind LCF competition, and how is scoring agreed in advance? | WG3 board; solver developers; testing labs; specimen providers; industrial sponsor | FABEST round 1 launch, blind submissions, public results report | WG3·WG4 | M14–M26 |
| 6 | Solver developers round table | What would bring commercial developers into open benchmarking, and on what (anonymised) terms? | WG3 leads; CTOs of solver vendors; resellers; industrial users | Agreed terms of participation; anonymised benchmarking offer | WG3·WG6 | M18–M30 |
| 7 | Standards, certification & policy alignment | How do FABER outputs map onto ASTM/ISO/CEN reporting, certification and EU policy? | ISO/CEN/ASTM contacts; certifiers (DNV etc.); NAFEMS; Commission DG contacts; WG2 | Pre-normative input package; draft scope for a CEN Workshop Agreement; policy brief | WG2·WG4 | M24–M36 |
| 8 | FABEST round 2 & compound problems | How do benchmarks scale to multiaxial, variable-amplitude, welded and additive cases (WG5)? | WG5 researchers; WG3 board; AM & welding communities (IIW); EFC | FABEST round 2; WG5 compound-problem groundwork & survey | WG3·WG5 | M30–M42 |
| 9 | Dissemination, uptake & PASP planning | How do the Repository, FABEST and FatPy continue beyond the grant, and through which structure? | Core Group; ESIS; EOSC; data-space & policymaker contacts; industry consortium candidates | Uptake plan; PASP scoping toward a European Fatigue Observatory & Innovation Centre | All WGs | M42–M48 |