Why this event, according to the MoU
The CRIM Technical Annex names this event directly. Section 3.2.2 commits the Action to engage policymakers through targeted reports and workshops at the Meteorological Technology World Expo and the WMO Technical Conferences.
Key goal 5
Engagement with stakeholders, manufacturers and end-users, including instrument manufacturers.
Section 3.1.1
Harmonised uncertainties give feedback to manufacturers and support the competitiveness of the European climate instrumentation market.
Section 2.2.2
Workshops and training disseminate best practice to manufacturers of weather stations, radiosondes and GNSS antennas.
Section 3.2.2
Temperature and water vapour activities align with ESA CCI and EUMETSAT satellite validation.
Stakeholder table by category
Exhibitors from the Expo's published 2026 list, matched to CRIM Working Groups, tasks and deliverables. Tier 1 organisations have a direct link to a CRIM deliverable; tier 2 are relevant to a Working Group; tier 3 are worth a contact if time allows.
| Organisation | Stand | MoU link | What to discuss | Tier |
|---|---|---|---|---|
| Radiosonde and upper-air manufacturers | ||||
| Vaisala OyjFinland | J55 | WG1Task 1.1, 1.2: D1, D3, D4, D5 |
|
Tier 1 |
| Meisei ElectricJapan | E05 | WG1Task 1.2: D3 |
|
Tier 1 |
| MeteomodemFrance | D23 | WG1WG4Task 1.1, 1.2, 4.2: D2, D3 |
|
Tier 1 |
| International Met Systems (InterMet)United States | D55 | WG1Task 1.1, 1.3 |
|
Tier 1 |
| Graw Radiosondesand GRAW MET Systems (HK) | F30, F40 | WG1Task 1.1, 1.3 |
|
Tier 2 |
| Lidar and atmospheric remote sensing | ||||
| Raymetrics S.A.Athens, Greece (only Greek exhibitor) | G20 | WG1Task 1.1: D1, D2; capacity building C1, C2 |
|
Tier 1 |
| Near-surface sensors and climate stations | ||||
| Station and sensor manufacturersCampbell Scientific (C65), Kipp & Zonen / OTT HydroMet (B50), Adolf Thies (J60), LSI Lastem (E60), Microstep MIS (J40), Geonor (G60), Observator (L40), R.M. Young (K76), Senseca Italy (D56), Meteoservis / Fiedler (J63), SIAP+MICROS (B60), CAE S.p.A. (D15), Barani Design (no stand listed) | see list | WG2Task 2.1, 2.2, 2.3: D6, D7, D8; R3, C3 |
|
Tier 2 |
| Satellite agency | ||||
| EUMETSATIntergovernmental | C60 | WG1WG3WG4Section 3.2.2; section 1.1.1 |
|
Tier 1 |
| Industry association | ||||
| HMEIGeneva; Expo commercial partner | J74 | WG4Task 4.1, 4.2: D14, D17; key goal 5 |
|
Tier 1 |
| Training | ||||
| Comet / UCARUnited States | M27 | WG4Task 4.2: D15 |
|
Tier 3 |
| GNSS water vapour | ||||
| No matching exhibitorGap on the Expo floor | none | WG3Task 3.1, 3.2, 3.3: D9 to D12 |
|
Tier 2 |
Communication plan
Owners follow the roles set out in MoU section 4.1.1: the Dissemination Coordinator supports meetings and conferences, the Communication Coordinator runs the website and social media, and WG Leaders hold the technical conversations.
Before the event
3 to 5 October
- Confirm which Core Group members and WG Leaders are in Amsterdam.
- Request meetings with all Tier 1 organisations through the contact form on each Expo exhibitor page.
- Prepare a one-page CRIM brief: aim, four WGs, and the deliverables open to industry input (D1, D3, D4, D5, D8, D14, D17).
- Add a QR code to the CRIM website on the brief and badges.
At the event
6 to 8 October, Expo hours
- Tuesday 6 October (10:00 to 17:00): radiosonde and lidar manufacturers, led by WG1.
- Wednesday 7 October (10:00 to 18:00): EUMETSAT, HMEI and near-surface manufacturers, led by WG2 and WG4.
- Thursday 8 October (10:00 to 15:00): open follow-ups, Tier 3, and TECO sessions for WG3 contacts.
- Post short updates during the event on CRIM channels (Communication Coordinator).
After the event
Within two weeks
- Log every contact with category, WG, deliverable link and agreed next step.
- Send each Tier 1 contact one specific ask tied to a named deliverable.
- Report outcomes to the Core Group and the next MC meeting.
- Feed results into the yearly update of the dissemination plan (Task 4.1).
Key message by audience
| Audience | Message | Ask |
|---|---|---|
| Instrument manufacturers | CRIM is building common QA and uncertainty frameworks for GRUAN, GSRN and GNSS reference measurements, with metrology oversight and alignment to WMO and GCOS standards. | Technical input to the relevant deliverable and a named contact for the users' forum. |
| Satellite agency | CRIM reference data and uncertainty methods are designed to support satellite validation, as stated in the MoU. | A contact point for alignment and attendance at a CRIM meeting. |
| Industry association | CRIM will issue best-practice guidelines that affect manufacturers across the hydromet sector. | Help reaching members for the forum (D14) and a possible joint session at a future Expo. |
| Training providers | CRIM will run three Summer Schools and publish the training material. | Exchange on formats and reuse of existing material. |
Measures of success