COST Action CA24155 CRIM

Stakeholder engagement brief for TECO-2026 and the Meteorological Technology World Expo

Who to meet in Amsterdam, what to discuss with each of them under the CRIM Memorandum of Understanding, and how to follow up.

Venue RAI Amsterdam TECO-2026 5 to 8 October 2026 Expo 6 to 8 October 2026 Prepared 3 October 2026

Why this event, according to the MoU

The CRIM Technical Annex names this event directly. Section 3.2.2 commits the Action to engage policymakers through targeted reports and workshops at the Meteorological Technology World Expo and the WMO Technical Conferences.

Key goal 5

Engagement with stakeholders, manufacturers and end-users, including instrument manufacturers.

Section 3.1.1

Harmonised uncertainties give feedback to manufacturers and support the competitiveness of the European climate instrumentation market.

Section 2.2.2

Workshops and training disseminate best practice to manufacturers of weather stations, radiosondes and GNSS antennas.

Section 3.2.2

Temperature and water vapour activities align with ESA CCI and EUMETSAT satellite validation.

Stakeholder table by category

Exhibitors from the Expo's published 2026 list, matched to CRIM Working Groups, tasks and deliverables. Tier 1 organisations have a direct link to a CRIM deliverable; tier 2 are relevant to a Working Group; tier 3 are worth a contact if time allows.

OrganisationStandMoU linkWhat to discussTier
Radiosonde and upper-air manufacturers
Vaisala OyjFinland J55 WG1Task 1.1, 1.2: D1, D3, D4, D5
  • GRUAN has data products for the RS92 (certified) and the RS41 (its RS41 page states "provisionally certified 2022"); ask for input to D3 on uncertainty sources and their classification at different time scales.
  • Input to D1, the end-to-end guidelines and protocols for radiosonde measurements and processing.
  • How manufacturer uncertainty information can feed the reporting guidance (D4) and tools (D5).
Tier 1
Meisei ElectricJapan E05 WG1Task 1.2: D3
  • GRUAN lists certified data products for the iMS-100 and RS-11G; use them as reference cases for D3.
  • Comparability of uncertainty estimates across manufacturers (section 3.1.1, harmonisation across techniques).
Tier 1
MeteomodemFrance D23 WG1WG4Task 1.1, 1.2, 4.2: D2, D3
  • GRUAN lists only a development version (M10-GDP-BETA.1) for the M10; ask how the CRIM QA framework (D2) and uncertainty methods (D3) could support completion.
  • Whether a CRIM participant could carry out data analysis with them through a short-term mobility (Task 4.2); eligibility of a company as host to be checked against COST rules.
Tier 1
International Met Systems (InterMet)United States D55 WG1Task 1.1, 1.3
  • GRUAN keeps launch lists for the iMet-1 and iMet-4; ask about the route to reference-quality processing.
  • Their WxUAS boundary-layer work against the WG1 aim to assess new industry solutions for critical regions and extreme conditions.
Tier 1
Graw Radiosondesand GRAW MET Systems (HK) F30, F40 WG1Task 1.1, 1.3
  • Radiosonde supplier not found in the GRUAN pages checked; ask about GRUAN use and calibration documentation.
  • Interest in the users' forum (D14).
Tier 2
Lidar and atmospheric remote sensing
Raymetrics S.A.Athens, Greece (only Greek exhibitor) G20 WG1Task 1.1: D1, D2; capacity building C1, C2
  • Lidar profiling of temperature, humidity and wind falls within WG1, which covers temperature and water vapour lidar.
  • Calibration and SI traceability for lidar, as input to D1 and D2.
  • Greece is a COST Inclusiveness Target Country; possible link to capacity-building objectives C1 and C2.
Tier 1
Near-surface sensors and climate stations
Station and sensor manufacturersCampbell Scientific (C65), Kipp & Zonen / OTT HydroMet (B50), Adolf Thies (J60), LSI Lastem (E60), Microstep MIS (J40), Geonor (G60), Observator (L40), R.M. Young (K76), Senseca Italy (D56), Meteoservis / Fiedler (J63), SIAP+MICROS (B60), CAE S.p.A. (D15), Barani Design (no stand listed) see list WG2Task 2.1, 2.2, 2.3: D6, D7, D8; R3, C3
  • Calibration and SI traceability of temperature and precipitation sensors against GSRN prescriptions (Task 2.1, D6).
  • Instrumental and installation factors in uncertainty reduction (Task 2.2, D7).
  • Web tools for including uncertainty in station data products (D8).
  • Membership in the users' forum for research and services (Task 2.1).
Product lines and any GSRN involvement not checked individually.
Tier 2
Satellite agency
EUMETSATIntergovernmental C60 WG1WG3WG4Section 3.2.2; section 1.1.1
  • The MoU commits CRIM temperature and water vapour activities to align with EUMETSAT satellite validation.
  • Reference measurements traceable to SI support comparison with satellite products (section 1.1.1).
  • Invitation to CRIM meetings and the forum.
Tier 1
Industry association
HMEIGeneva; Expo commercial partner J74 WG4Task 4.1, 4.2: D14, D17; key goal 5
  • Single route to member manufacturers for the forum between academia, research, users, industry and service providers (D14).
  • Distribution of CRIM best-practice guidelines to manufacturers (section 2.2.2).
  • A CRIM workshop or session at a future Expo, as foreseen in section 3.2.2.
Tier 1
Training
Comet / UCARUnited States M27 WG4Task 4.2: D15
  • Training formats and materials for the three CRIM Summer Schools and publicly available training material (D15).
Exhibitor page not checked.
Tier 3
GNSS water vapour
No matching exhibitorGap on the Expo floor none WG3Task 3.1, 3.2, 3.3: D9 to D12
  • No exhibitor name or exhibitor page checked indicates a GNSS-PWV provider; the full list was not screened page by page. Find WG3 contacts in the TECO-2026 conference sessions.
  • GRUAN publishes a GNSS precipitable water omnibus (GRUAN-TD-6) that can serve as common ground in those conversations.
Tier 2

Communication plan

Owners follow the roles set out in MoU section 4.1.1: the Dissemination Coordinator supports meetings and conferences, the Communication Coordinator runs the website and social media, and WG Leaders hold the technical conversations.

Before the event

3 to 5 October

  • Confirm which Core Group members and WG Leaders are in Amsterdam.
  • Request meetings with all Tier 1 organisations through the contact form on each Expo exhibitor page.
  • Prepare a one-page CRIM brief: aim, four WGs, and the deliverables open to industry input (D1, D3, D4, D5, D8, D14, D17).
  • Add a QR code to the CRIM website on the brief and badges.

At the event

6 to 8 October, Expo hours

  • Tuesday 6 October (10:00 to 17:00): radiosonde and lidar manufacturers, led by WG1.
  • Wednesday 7 October (10:00 to 18:00): EUMETSAT, HMEI and near-surface manufacturers, led by WG2 and WG4.
  • Thursday 8 October (10:00 to 15:00): open follow-ups, Tier 3, and TECO sessions for WG3 contacts.
  • Post short updates during the event on CRIM channels (Communication Coordinator).

After the event

Within two weeks

  • Log every contact with category, WG, deliverable link and agreed next step.
  • Send each Tier 1 contact one specific ask tied to a named deliverable.
  • Report outcomes to the Core Group and the next MC meeting.
  • Feed results into the yearly update of the dissemination plan (Task 4.1).

Key message by audience

AudienceMessageAsk
Instrument manufacturersCRIM is building common QA and uncertainty frameworks for GRUAN, GSRN and GNSS reference measurements, with metrology oversight and alignment to WMO and GCOS standards.Technical input to the relevant deliverable and a named contact for the users' forum.
Satellite agencyCRIM reference data and uncertainty methods are designed to support satellite validation, as stated in the MoU.A contact point for alignment and attendance at a CRIM meeting.
Industry associationCRIM will issue best-practice guidelines that affect manufacturers across the hydromet sector.Help reaching members for the forum (D14) and a possible joint session at a future Expo.
Training providersCRIM will run three Summer Schools and publish the training material.Exchange on formats and reuse of existing material.

Measures of success

7Tier 1 meetings held
7Follow-up emails sent with a deliverable-specific ask
1 or moreOrganisations committed to the users' forum (D14)
1 or moreWG3 GNSS contacts identified at TECO sessions
From Mapping to Impact: a strategic stakeholder framework for COST Actions

Method: From Mapping to Impact

This brief is a short version of the Greek Scientists Society stakeholder framework, which turns a stakeholder list into a prioritised, MoU-anchored engagement plan. A full analysis for CRIM would add salience, power and interest, engagement and combined priority scoring across the whole register. Read the framework