Summary
Europe’s Rail Joint Undertaking (EU-Rail) aims to deliver, via an integrated system approach, a high-capacity, flexible, multimodal, sustainable, reliable and integrated EU railway network for European passengers and cargo.
Programme Name
Programme Description
Europe’s Rail Joint Undertaking (EU-Rail) aims to deliver, via an integrated system approach, a high-capacity, flexible, multimodal, sustainable, reliable and integrated EU railway network for European passengers and cargo.
Call
Detailed Call Description
The application of electrolysers to industrial clusters and hydrogen hubs in order to achieve substantial CO2 savings is inhibited by the present capacities of electrolyser stacks. There are several R&I challenges which first need to be overcome to realise this. Proposals are expected to address the following:
- Scale-up of cell active areas by a factor of at least two, operating at higher current densities and increasing the number of cells per stack, while ensuring durability and performance (mechanically, electrically and in terms of heat and mass transfer) for the envisaged balanced pressure or differential pressure stack;
- Ensure the catalyst and electrode production techniques achieve uniform performance for the required cell areas;
- Develop appropriate production methods and supply chains for larger cell plates and electrodes;
- Establish any technical limits that may restrict the achievable cell size, current density or stack size for a large electrolyser;
- Establish the extent of cost reductions, relative to a SoA stack, when innovating larger cells and stack;
- Ensure a good match between the design of the stack assembly and the power supply unit to minimise energy losses and the overall cost of the electrolyser module;
- Appropriately scale-up of the balance-of-plant while ensuring a compact design for the electrolyser module;
- Minimise weight and footprint to ensure ease of handling and shipping;
- Maximise the overall cost reduction potential by minimising parts count and value engineering;
- Build and test several short stacks, based on large cells, in order to establish the feasibility of subsequently building an electrolyser module of 10MW capacity comprising preferably a single stack;
- Identifying any optimal sizes for larger cells and stacks from scientific, engineering, logistics and economic perspectives.
Programme Category
EU Competitive ProgrammesTotal Budget
€121,000,000Thematic Categories
- Energy
- Fisheries/ Aquaculture and Maritime Policy
- Other Thematic Category
- Research, Technological Development and Innovation
Eligibility for Participation
- Researchers/Research Centers/Institutions